Part A5 Documentation of design and construction
TAS A5G4 Evidence of suitability ─ Volume Three (PCA)2019: A5.3
- WaterMark Licence issued in accordance with the WaterMark Certification Scheme; or
- a current certificate issued by a certification body stating that the properties and performance of a product meet the requirements of the NCC Volume Three; or
- authorisation from the Director of Building Control.
TAS A5G4 Evidence of suitability ─ Volume Three (PCA)2019: A5.3
- an On-site wastewater management system used in a plumbing installation must be issued with a Certificate of Accreditation in accordance with the AS 1546 series of Standards; or
- a current certificate issued by a JAS-ANZ accredited certification body stating that the properties and performance of a product meets the requirement of NCC Volume Three; and
- accreditation from the Director of Building Control.
TAS A5G4 Evidence of suitability ─ Volume Three (PCA)2019: A5.3
TAS A5G4 Evidence of suitability ─ Volume Three (PCA)2019: A5.3
Products accredited by the Director of Building Control are published in a list available at www.cbos.tas.gov.au.