Calculating the Total-R-Value – Case study 3

This case study shows how to calculate the Total R-Value, including thermal bridging, for roof system in a Class 7 storage facility located in climate zone 6.

Case study
Calculating the Total-R-Value – Case study 2

This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 6 shop located in climate zone 3.

Case study
Calculating the Total-R-Value – Case study 1

This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 3 residential building located in climate zone 5.

Case study
Accessible Entrance Performance Solution Process

This case study outlines the application of NCC Provision A2.2(4). It aims to demonstrate a practical application of the NCC Performance Solution process.

Case study
Energy efficiency of fan systems

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating a Performance Solution concerning energy efficiency of a new reta

Weatherproofing (FV1.1)

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning weatherproofing.

Hotel Façade

This Case Study outlines developing a DTS Solution and a Performance Solution for the energy efficiency of the facade of a hotel.

High rise apartment stack

Performance Solution scenario This Performance Solution scenario has been developed to assist plumbing practitioners in formulating Performance Solutions concerning high rise apartment stacks.

Adaptive thermal comfort and PMV

Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions concerning energy efficiency.

Verification using Green Star JV2

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions using the Green Star - Design and As Built

Eurovent Standards for chillers

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating a Performance Solution concerning energy efficiency of a Class 5

Small office building

This Case Study outlines developing a DTS Solution for the energy efficiency of a small office building. It is based on the DTS Provisions in Section J of NCC Volume One.

Prevention of surface water entry

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning prevention of surface water entr

Construction of houses in a flood hazard area

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning construction of houses in flood

Verification using NABERS energy for offices JV1

Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions using a NABERS Energy Commitment Agreement.

Existing building shed to dwelling

Performance Solution Scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions when converting a farm shed to a habitable

Lighting refurbishment of an office building

This Case Study outlines developing a DTS Solution for the energy efficiency of an interior lighting refurbishment for an office building.

Single story house energy efficiency

Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning single storey house energy effic