NCC 2019 Volume One Amendment 1
Search the National Construction Code editions
NSW Part J(A)4 Heated water supply
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement NSW J(A)P3 is satisfied by complying with NSW J(A)4.1 and NSW J(A)4.2.
Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2.2(3) and A2.4(3) as applicable.
The Deemed-to-Satisfy Provisions of this Part apply to a Class 2 building and a Class 4 part of a building.