NSW Part J(A)2 Building Sealing

NSW Part J(A)2 Building Sealing

NSW J(A)2.0 Deemed-to-Satisfy Provisions

(a)

Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement NSW J(A)P2 is satisfied by complying with NSW J(A)2.1 and NSW J(A)2.2.

(b)

Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A0.7.

NSW J(A)2.1 Application of Part

The Deemed-to-Satisfy Provisions of this Part apply to elements forming the envelope of a Class 2 building and a Class 4 part of a building, other than—

(a)

a building in climate zones 2 and 5 where the only means of air-conditioning is by using an evaporative cooler; or

(b)

a permanent building opening, in a space where a gas appliance is located, that is necessary for the safe operation of a gas appliance; or

(c)

parts of buildings that cannot be fully enclosed.

NSW J(A)2.2 Compliance with BCA provisions

Class 2 buildings and Class 4 parts of buildings must comply with the following national BCA provisions, as applicable—

(a)

J3.2 Chimneys and flues; and

(b)

J3.3 Roof lights; and

(c)

J3.4 Windows and doors; and

(d)

J3.5 Exhaust fans; and

(e)

J3.6 Construction of roofs, walls and floors; and

(f)

J3.7 Evaporative coolers.