NCC 2016 Volume One
Classification
Building class 1a Building class 1b Building class 2 Building class 3 Building class 4 Building class 5 Building class 6 Building class 7a Building class 7b Building class 8 Building class 9a Building class 9b Building class 9c Building class 10a Building class 10b Building class 10c

Filter

Classification
Building class 1a Building class 1b Building class 2 Building class 3 Building class 4 Building class 5 Building class 6 Building class 7a Building class 7b Building class 8 Building class 9a Building class 9b Building class 9c Building class 10a Building class 10b Building class 10c
Section A General Provisions

Section A General Provisions

ACT Specification A1.3 Documents Adopted by Reference

Part A1 Interpretation

Insert in Table 1 of Specification A1.3 the following:

ACT Table 1: SCHEDULE OF REFERENCED DOCUMENTS

No. Date Title BCA Clause(s)
AS 1375 2013 Industrial fuel-fired appliances ACT G2.2
AS 1692 2006 Tanks for flammable and combustible liquids ACT G2.2
Development Control Code for Best Practice Waste Management in the ACT ACT A2.102

Part A2 Acceptance of Design and Construction

Add ACT AO2 as follows:

OBJECTIVE

ACT AO2

The Objective of this Part is to—

(a)

prevent windblown litter from building sites fouling roads and public land; and

(b)

safeguard people from injury caused by infection or contamination from solid waste.

Add ACT AF2.1 to ACT AF2.2 as follows:

FUNCTIONAL STATEMENTS

ACT AF2.1

Building litter must be prevented from spreading around and beyond the allotment boundary.

ACT AF2.2

Buildings must be provided with space and facilities for the collection, and safe, hygienic holding prior to disposal of solid waste arising from the intended use of the building.

Add ACT AP2.1 to ACT AP2.2 as follows:

PERFORMANCE REQUIREMENTS

ACT AP2.1

Sufficient containers must be provided on building sites to store building waste that is likely to become windblown.

ACT AP2.2

Provision must be made within buildings for the collection and temporary holding of solid waste. The design must accommodate screening, volume of waste, disposal, logistics and access.

Add ACT A2.0 as follows:

DEEMED-TO-SATISFY PROVISIONS

ACT A2.0 Deemed-to-Satisfy Provisions

to are satisfied by complying with to ACT A2.102.

Add ACT A2.101 to ACT A2.103 as follows:

ACT A2.101 Control of litter on building sites

(a)

On-site building waste must be stored in suitable size plastic or metal bins and removed from the allotment at regular intervals.

(b)

For the purpose of this clause, building waste includes plastic containers, plastic and paper wrappings, or any waste that can be carried by wind.

ACT A2.102 Waste management

Garbage facilities must be designed and constructed in accordance with the Development Control Code for Best Practice Waste Management in the ACT.