NCC 2016 Volume One
Classification
Building class 1a Building class 1b Building class 2 Building class 3 Building class 4 Building class 5 Building class 6 Building class 7a Building class 7b Building class 8 Building class 9a Building class 9b Building class 9c Building class 10a Building class 10b Building class 10c

Filter

Classification
Building class 1a Building class 1b Building class 2 Building class 3 Building class 4 Building class 5 Building class 6 Building class 7a Building class 7b Building class 8 Building class 9a Building class 9b Building class 9c Building class 10a Building class 10b Building class 10c
NSW Part J(A)4 Heated Water Supply

NSW Part J(A)4 Heated Water Supply

NSW J(A)4.0 Deemed-to-Satisfy Provisions

(a)

Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement NSW J(A)P3 is satisfied by complying with NSW J(A)4.1 and NSW J(A)4.2.

(b)

Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A0.7.

NSW J(A)4.1 Application of Part

The Deemed-to-Satisfy Provisions of this Part apply to a Class 2 building and a Class 4 part of a building.

NSW J(A)4.2 Compliance with BCA provisions

Class 2 buildings and Class 4 parts of buildings must comply with the national BCA provisions of J7.2 Heated water supply.

Note: Compliance is not required with the national BCA provisions of J7.3 and J7.4 as those matters are regulated under BASIX.