NCC 2016 Volume Three
Search the National Construction Code editions
Part A1 Interpretation
Note: States and Territories may vary or add to the definitions contained in A1.1 at the relevant State or Territory Appendix.
If a word is not defined in this Part, the meaning (if any) attributed to it under AS/NZS 3500.0 Glossary of Terms should be used unless the contrary intention appears.
Figure A1.1 — CLIMATE ZONES FOR THERMAL DESIGN
|
Notes:
|
Table A1.1 CLIMATE ZONES FOR THERMAL DESIGN - VARIOUS LOCATIONS
Location | Climate Zone | Location | Climate Zone | Location | Climate Zone | Location | Climate Zone |
---|---|---|---|---|---|---|---|
Australian Capital Territory | Canberra | 7 | |||||
New South Wales | |||||||
Albury | 4 | Byron Bay | 2 | Lord Howe Island | 2 | Sydney West | 6 |
Armidale | 7 | Cobar | 4 | Moree | 4 | Tamworth | 4 |
Batemans Bay | 6 | Coffs Harbour | 2 | Newcastle | 5 | Thredbo | 8 |
Bathurst | 7 | Dubbo | 4 | Nowra | 6 | Wagga Wagga | 4 |
Bega | 6 | Goulburn | 7 | Orange | 7 | Williamtown | 5 |
Bellingen Shire - Dorrigo Plateau | 7 | Grafton | 2 | Perisher Smiggins | 8 | Wollongong | 5 |
Bellingen Shire - Valley & seaboard | 2 | Griffith | 4 | Port Macquarie | 5 | Yass | 6 |
Bourke | 4 | Ivanhoe | 4 | Sydney East | 5 | Broken Hill | 4 |
Lismore | 2 | ||||||
Northern Territory | |||||||
Alice Springs | 3 | Elliot | 3 | Renner Springs | 3 | Darwin | 1 |
Katherine | 1 | Tennant Creek | 3 | ||||
Queensland | |||||||
Birdsville | 3 | Cunnamulla | 3 | Maryborough | 2 | Toowoomba | 5 |
Brisbane | 2 | Longreach | 3 | Mount Isa | 3 | Torrens Creek | 3 |
Bundaberg | 2 | Gladstone | 2 | Normanton | 1 | Townsville | 1 |
Cairns | 1 | Labrador | 2 | Rockhampton | 2 | Warwick | 5 |
Cooktown | 1 | Mackay | 2 | Roma | 3 | Weipa | 1 |
South Australia | |||||||
Adelaide | 5 | Kingscote | 6 | Marree | 4 | Port Lincoln | 5 |
Bordertown | 6 | Leigh Creek | 5 | Mount Gambier | 6 | Renmark | 5 |
Ceduna | 5 | Lobethal | 6 | Murray Bridge | 6 | Tarcoola | 4 |
Cook | 4 | Loxton | 5 | Oodnadatta | 4 | Victor Harbour | 6 |
Elliston | 5 | Naracoorte | 6 | Port Augusta | 4 | Whyalla | 4 |
Tasmania | |||||||
Burnie | 7 | Flinders Island | 7 | Launceston | 7 | Rossarden | 7 |
Bicheno | 7 | Hobart | 7 | New Norfolk | 7 | Smithton | 7 |
Deloraine | 7 | Huonville | 7 | Oatlands | 7 | St Marys | 7 |
Devonport | 7 | King Island | 7 | Orford | 7 | Zeehan | 7 |
Victoria | |||||||
Anglesea | 6 | Bright | 7 | Horsham | 6 | Swan Hill | 4 |
Ararat | 7 | Colac | 6 | Melbourne | 6 | Traralgon | 6 |
Bairnsdale | 6 | Dandenong | 6 | Mildura | 4 | Wangaratta | 7 |
Ballarat | 7 | Echuca | 4 | Portland | 6 | Warrnambool | 6 |
Benalla | 6 | Geelong | Geelong | Sale | 6 | Wodonga | 6 |
Bendigo | 6 | Hamilton | 7 | Shepparton | 4 | ||
Western Australia | |||||||
Albany | 6 | Cocos Island | 1 | Kalgoorlie- Boulder | 4 | Port Hedland | 1 |
Balladonia | 4 | Derby | 1 | Karratha | 1 | Wagin | 4 |
Broome | 1 | Esperance | 5 | Meekatharra | 4 | Wyndham | 1 |
Bunbury | 5 | Exmouth | 1 | Northam | 4 | Carnarvon | 3 |
Geraldton | 5 | Pemberton | 6 | Christmas Island | 1 | Halls Creek | 3 |
Perth | 5 |
See also the Australian Drinking Water Quality Guidelines produced by the National Health and Medical Research Council.
The level of qualification and/or experience required to determine whether a Performance Solution complies with the Performance Requirements may differ depending on the degree of complexity and the requirements of the regulatory authority. Practitioners should seek advice from the authority having jurisdiction for clarification as to what will be accepted.
A Network Utility Operator in most States and Territories is the water and sewerage authority licensed to supply water and receive sewage and/or stormwater. The authority operates or proposes to operate a network that undertakes the distribution of water for supply and undertakes to receive sewage and/or stormwater drainage. This authority may be a licensed utility, local government body or council.
(Tas, On-site wastewater management system)
The WaterMark Schedule of Products and the WaterMark Schedule of Excluded Products can be viewed on the ABCB website at www.abcb.gov.au
Where a Deemed-to-Satisfy Provision references a document, rule, specification or provision, that adoption does not include a provision—
specifying or defining the respective rights, responsibilities or obligations as between themselves of any manufacturer, supplier or purchaser; or
specifying the responsibilities of any trades person or other building operative, architect, engineer, authority, or other person or body; or
permitting a departure from the PCA, rule, specification or provision at the sole discretion of the manufacturer or purchaser, or by arrangement or agreement between the manufacturer and purchaser.
A reference in a Deemed-to-Satisfy Provision to a document under A1.2 refers to the edition or issue, together with any amendment listed in Table A3.1 and only so much as is relevant in the context in which the document is quoted.
Any—
reference in a document listed in Table A3.1 (primary document) to another document (secondary document); and
subsequent references to other documents in secondary documents and those other documents,
is a reference to the secondary and other documents as they existed at the time of the primary document listed in Table A3.1
The provisions of (b) do not apply if the secondary referenced document is also a primary referenced document.
Where the PCA references a document under A1.2 which is subject to publication of a new edition or amendment not listed under Table A3.1, the new edition or amendment need not be complied with in order to comply with the Deemed-to-Satisfy Provisions.
The NCC overrules in any difference arising between it and any Standard, rule, specification or provision in a document listed in Table A3.1.
Subject to A1.6, plumbing and drainage systems must be so designed, constructed and installed that they comply with the relevant provisions of Section A and the Performance Requirements of this Volume.
For application within a particular State or Territory, this Volume of the NCC comprises—
Sections A to G (inclusive); and
the variations, deletions and additions to Sections A to G applicable to that State or Territory specified in the relevant Appendix.
A reference to a building in the NCC is a reference to an entire building or part of a building, as the case requires.
A reference in a Performance Requirement of the NCC to "the degree necessary" means that consideration of all the criteria referred to in the Performance Requirement will determine the outcome appropriate to the circumstances. These words have been inserted to indicate that in certain situations it may not be necessary to incorporate any specific measures to meet the Performance Requirement.
A reference to Class 1a, 1b, 7a, 7b, 9a, 9b, 9c, 10a, 10b and 10c is a reference to the separate classification.
A reference to—
Class 1 — is a reference to a Class 1a and 1b; and
Class 7 — is a reference to a Class 7a and 7b; and
Class 9 — is a reference to a Class 9a, 9b and 9c; and
Class 10 — is a reference to a Class 10a, 10b and 10c.
These elements of the PCA are non-mandatory. They are used to provide additional guidance on the application of particular Parts and clauses and do not need to be followed to meet the requirements of the PCA.
Explanatory Information identified for cross-volume consideration is also provided under certain Deemed-to-Satisfy Provisions to identify Parts of NCC Volumes One and Two – the Building Code of Australia (BCA) which may be relevant where the plumbing or drainage work being undertaken—
may interfere with the integrity of a building element or system; or
is subject to the requirements of the BCA.
Explanatory Information for the Performance Requirements contains both Objectives and Functional Statements. An Objective means a statement contained in the NCC which is considered to reflect community expectations. Functional Statements are statements which describe how a plumbing or drainage system achieves the Objectives. It is the ABCB’s intent that the Objectives and Functional Statements be used as an aid to the interpretation of the NCC and not for determining compliance with the NCC.
The ABCB gives no warranty or guarantee that the Explanatory Information is correct or complete. The ABCB shall not be liable for any loss howsoever caused whether due to negligence or otherwise arising from the use of or reliance on the Explanatory Information.