Part C1 Sanitary Plumbing Systems (Deemed-to-Satisfy)

Part C1 Sanitary Plumbing Systems (Deemed-to-Satisfy)

C1.1 Deemed-to-Satisfy Provisions

Performance RequirementsCP1.1 and CP1.2 are satisfied by complying with C1.2 and C1.3.

C1.2 General requirements

NSW C1.2(a)

Qld C1.2(a)

SA C1.2(a)

Vic C1.2(a)

(a)

The design, construction, installation, replacement, repair, alteration and maintenance of a sanitary plumbing system must be in accordance with—

(i)

AS/NZS 3500.2; or

(ii)

for a Class 1a or Class 10 building only, Section 4 of AS/NZS 3500.5;

and the requirements of this Part.

(b)

* * * * *

C1.3 Accessible fixtures and fittings

Sanitary fixtures provided for people with a disability must be in accordance with—

(a)

AS 1428.1 (2001) and AS 1428.2 for all Class 9b and Class 10 public transport buildings; and

(b)

AS 1428.1 (2009) for all other buildings.

Explanatory information: Cross-volume considerations

Explanatory information: Cross-volume considerations

Part F2 of NCC Volume One sets out the requirements for the design and construction of accessible sanitary facilities in Class 1b, 2 to 9, and 10a buildings.

Explanatory information: Non-flushing (waterless) urinals

Explanatory information: Non-flushing (waterless) urinals

NCC Volumes One and Two deal with a number of areas of on-site construction which are relevant to sanitary plumbing systems. These include, but may not be limited to, the following:

NCC Volume One Class 2 to 9 buildings

NCC Volume Two Class 1 and 10 buildings

Termite management for attachments to a building and penetrations through a slab

B1 Structural Provisions

3.1.3 Termite Risk Management

Penetrations for pipework through a vapour barrier

B1 Structural Provisions

3.2.2 Preparation

Pipework in timber bearers and joists of solid timber or engineered wood products

B1 Structural Provisions

3.4.0 Framing

Fittings, fixtures and pipework installations in steel framed construction

B1 Structural Provisions

3.4.2 Steel Framing

Penetrations through a fire-resisting wall or floor

C3 Protection of Openings

3.7.1 Fire Separation

Fixtures or fittings in a wet area

F1 Damp and Weatherproofing

3.8.1 Wet Areas and External Weatherproofing

Service pipework external to the building and penetrations through roof cladding in a bushfire prone area

G5 Construction in Bushfire Prone Areas

3.7.4 Bushfire Areas

Pipework sound insulation

F5 Sound Transmission and Insulation

3.8.6 Sound Insulation