NCC 2016 Volume Three
Search the National Construction Code editions
Section B Water Services
Delete B1.2(a) and insert NSW B1.2(a) as follows:
The design, construction, installation, replacement, repair, alteration and maintenance of cold water services must be in accordance with the following:
AS/NZS 3500.1 with the following additions:
After clause 5.3.2(k) add (l) as follows:
Where valves are located below ground within the property boundary, they shall be provided with a surface box and riser. The box lid shall be permanently marked with a "W".
After clause 4.6.3.3 insert clause 4.7 as follows:
Backflow prevention shall be positioned so that —
cooling tower air gap must be measured from the rim of the cooling tower basin; and
if a drinking water service to the cooling tower passes through the basin, the service pipe must be provided with a double wall protection; and
if a fast fill connection is required, the fast fill line shall terminate externally to the unit, with an air gap over either the basin or a tundish.
NOTE: See NSW Figure B1.2 Typical Cooling Tower Connections.
NSW Figure B1.2 Typical Cooling Tower Connections
|
After clause 16.3.3(c) insert (d) and (e) as follows:
Single residential dwellings require the following:
Buried or partly buried rainwater tanks a non-testable dual check valve with atmospheric port is required for containment protection; and
a non-testable device for zone protection. The Network Utility Operator reserves the right to require greater backflow for containment.
Where rainwater tanks are installed for other than a single residential dwelling approval must be obtained from the water supply Network Utility Operator for containment.
The requirements of this Part.
This clause has deliberately been left blank.
Explanatory information:
BV2.2 does not apply in NSW as the sources of energy for new Class 1 and 10 buildings are regulated under BASIX.
Delete B2.2(a) and insert NSW B2.2(a) as follows:
The design, construction, installation, replacement, repair, alteration and maintenance of a heated water service must be in accordance with AS/NZS 3500.4 and the requirements of this Part.
Delete B2.4 and insert NSW B2.4 as follows:
The design, construction, installation, replacement, repair, alteration and maintenance of a non-drinking water service must be in accordance with the following:
AS/NZS 3500.1 with the following variations:
All external taps are to comply with clause 9.3.2.3(d)(i) only;
After clause 10.3(c) insert (d) and (e) as follows:
Top up from a drinking water supply shall be by an indirect trickle top up with a visible air gap external to the tank.
There shall be no connection between treated greywater systems and the drinking water, rainwater or other sources of supply.
The requirements of this Part.
Part B4 does not apply in New South Wales.
Note:
This Part does not apply in New South Wales as fire-fighting water services are regulated under the Environmental Planning and Assessment Act 1979 and Environmental Planning and Assessment Regulation 2000, which references the Building Code of Australia.