Part 3.2.0 Application
Performance RequirementsP2.1.1 and P2.2.3 are satisfied for footings and slabs if they are installed in accordance with one of the following:
The footing or slab is constructed in accordance with AS 2870.
Piled footings are designed in accordance with AS 2159.
Composite construction — design requirements for other materials that may be used in combination with the above footing systems, including the use of heavy steel support beams, etc. are described in Part 3.0 — structural provisions.
State and Territory Variations
In New South Wales delete 3.2.0(a) and insert NSW 3.2.0(a) as follows:
(a) The footing or slab is constructed in accordance with AS 2870 except that for the purposes of Clause 5.3.3.1 of AS 2870 a damp-proofing membrane is required to be provided.