1.0 Preface

1.0 Preface

Note:

Note:

Schedule 7 does not take effect until 1 May 2020.

This Fire Safety Verification Method provides a process for engineering the design of fire safetyPerformance Solutions. The document provides the flexibility required to develop Performance Solutions while still maintaining the level of safety required by the NCC.

To ensure that the level of safety required by the NCC is maintained, the level of safety achieved using this Verification Method must be at least equivalent to the relevant NCC Volume One Deemed-to-Satisfy Provisions.

Section 1 of this document provides an introduction to the Verification Method and its application.

Section 2 describes the design fire scenarios.