NCC 2019 Volume Two
Search the National Construction Code editions
NSW Part 3.12.3 Building sealing
Where a Performance Solution to NSW 3.12.3 is proposed, that proposal must comply with—
Compliance with NSW 3.12.3.1 satisfies NSW P2.6.1(b) for building sealing.
NSW Part 3.12.3 is not applicable to—
existing buildings being relocated; or
Class 10a buildings without a conditioned space; or
parts of buildings that cannot be fully enclosed; or
a permanent building opening, in a space where a gas appliance is located, that is necessary for the safe operation of a gas appliance; or
a building in climate zones 2 and 5 where the only means of air-conditioning is by using an evaporative cooler.
The sealing of a building must comply with the national BCA provisions 3.12.3.1 to 3.12.3.6.
Such rooms are unlikely to be conditioned given the high air flow rates; therefore applications of the Performance Requirement to these parts of buildings would not result in reduction in energy use.