This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a sanitary drainage system of a property including from sanitary fixtures and appliances to an approved disposal system.
OBJECTIVE
CO2
The Objective of this Part is to—
FUNCTIONAL STATEMENTS
CF2.1
Sanitary fixtures and sanitary appliances must be provided with an adequate disposal system that does not impact adversely on occupants of the premises, property, the environment or the Network Utility Operator's infrastructure.
CF2.2
Adequate means for the disposal of swimming pool waste water and drainage is to be provided to each swimming pool.
A sanitary drainage system must ensure the following:
Sewage is transferred from a sanitary plumbing system to an approved disposal system.
Access for maintenance and clearing blockages.
Ventilation to avoid foul air and gases accumulating in the sanitary drainage and sewerage system.
Protection against internal contamination.
A sanitary drainage system must avoid the following:
Damage from root penetration, superimposed loads or ground movement.
Entry of water, foul air and gases from the system into buildings.
Entry of surface water, sub-surface water and stormwater into the system.
Damage to existing buildings or site works.
Damage to the Network Utility Operator's sewerage system or other approved disposal system.
A swimming pool must have adequate means of draining the pool in a manner that will not—
cause illness to people; or
Compliance with CP2.1(2)(a) is achieved if the sanitary drainage system is designed to operate with—
a liquid-to-air ratio of between 1:1 and 0.65:0.35; and
a minimum velocity of 0.8 m/s; and
a maximum velocity of—
2 m/s under normal operating conditions; and
3.5 m/s under surge conditions.
Compliance with CP2.1(2)(a) is achieved if the sanitary drainage system passes one or more of the pressure tests set out in Section 15 of AS/NZS 3500.2.
Performance RequirementsCP2.1 and CP2.2 are satisfied by complying with C2.2 to C2.4.
The invert level of a trap or gully weir must be a minimum of 10 mm higher than the soffit of the pipe to which it connects.
Where pumped discharge from a swimming pool connects to a gully riser it must be installed in accordance with AS/NZS 3500.2.
The design, construction, installation, replacement, repair, alteration and maintenance of a sanitary drainage system must be in accordance with AS/NZS 3500.2.
Vic C2.4(2), (3), (4), (5)
Item |
NCC Volume One Class 2 to 9 buildings |
NCC Volume Two Class 1 and 10 buildings |
---|---|---|
Excavations for pipework adjacent to a building and footings |
||
Termite management for attachments to buildings and penetrations through a slab |
||
Penetrations for pipework through a vapour barrier |
||
Pipework in timber bearers and joists of solid timber or engineered wood products |
||
Fittings, fixtures and pipework installations in steel framed construction |
||
Penetrations through a fire-resisting wall or floor |