NCC 2019 Volume Three
Search the National Construction Code editions
Tas Section I Materials and products certification and authorisation
Plumbing and drainage materials and products must—
be durable and fit for their intended purpose; and
meet the Performance Requirements of the relevant Parts of the PCA; and
be authorised.
Sanitary plumbing and drainage products may be verified as meeting the Performance Requirements of Tas I101 P1if it is certified under the WaterMark Certification Scheme (see ABCB website for details).
A product for use in a stormwater installation may be verified as meeting the Performance Requirements of Tas I101 P1 if it complies with the requirements of Section 2 of AS/NZS 3500.3.
A product not covered by Tas I101 V1 or Tas I101 V2 may be authorised for use in Tasmania under Tas I101.5.
A septic tank may be verified as meeting the Performance Requirements of Tas I101 P1 if it complies with AS/NZS 1546.1.
A holding tank or collection well for use in a plumbing or drainage installation may be verified as meeting the Performance Requirements of Tas I101 P1 if it complies with AS/NZS 1546.1.
Performance RequirementTas I101 P1 is satisfied by complying with Tas I101.3.
A material or product used in a plumbing or drainage installation must be certified and authorized under the WaterMark Certification Scheme (see ABCB website for details), where specified under A5.0.
A unique plumbing material or product satisfies the Performance Requirement of Tas I101 P1 if—
authorised by the Director of Building Control; or
Products included on a list published by the Tasmanian Government for the purpose of this Part satisfy the Performance Requirement of Tas I101 P1.
A unique plumbing material or product satisfies the Performance Requirement of Tas I101 P1 if—
This Part applies to all on-site wastewater management systems except for systems—
exempted under the Tasmania Plumbing Regulations; or
under the jurisdiction of the Environmental Management and Pollution Control Act 1993; or
which forms part of a water and sewerage authority's infrastructure.
An on-site wastewater management system must—
Be durable and fit for purpose;
meet the Performance Requirements of the PCA; and
Be issued with a Certificate of Accreditation in Tasmania under this Part.
An on-site wastewater management system may be verified as meeting the Performance Requirements of this Part if a Certificate of Accreditation for the system has been issued.
Performance RequirementTas I102 P1 is satisfied by complying with Tas I102.3.
An on-site wastewater management system used in a plumbing installation must be issued with a Certificate of Accreditation.