NSW Part J(A)3 Air-Conditioning and Ventilation Systems
NSW J(A)3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement NSW J(A)P3 is satisfied by complying with NSW J(A)3.1 and NSW J(A)3.2.
(b)
Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A0.7.
NSW J(A)3.1 Application of Part
The Deemed-to-Satisfy Provisions of this Part apply to a Class 2 building and a Class 4 part of a building.
NSW J(A)3.2 Compliance with BCA provisions
Class 2 buildings and Class 4 parts of buildings must comply with the following national BCA provisions, as applicable—
(b)
J5.3 Mechanical ventilation systems; and
(c)
J5.4 Miscellaneous exhaust systems.
Note: Compliance is not required with the national BCA provisions of J5.2(e) as those matters are regulated under BASIX.