Displaying 106 - 126 of 157
This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 6 shop located in climate zone 3.
This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 3 residential building located in climate zone 5.
This Advisory Note explains the intent of the concessions in Specification C1.1, Clauses 3.10(a) and 4.3 (a) of NCC Volume One.
This discussion paper was released in April 2014, it informed and sought feedback from stakeholders on the resilience of new buildings to extreme weather events.
This report shows the results of a number of building models that compare the energy, cost and greenhouse gas emission reductions of buildings built to Deemed to Satisfy provisions of Section J NCC
This Regulation Impact Statement (RIS) was prepared to incorporate the proposed amendments to the Australian Standard AS 3959-1999 Construction of buildings in bushfire prone areas (the Standard),
At its meeting on 19 February 2016, the Building Ministers’ Forum agreed to the development and implementation of a range of measures to help address risks associated with high risk cladding produc
This Advisory Note relates to requirements to protect certain openable windows to reduce the risk of young children falling from those windows.
Advisory Note This Advisory Note relates to requirements for stairways, landings and ramps to have slip-resistant, non-skid or non-slip surfaces.
This Case Study outlines developing a DTS Solution for the energy efficiency of a small office building. It is based on the DTS Provisions in Section J of NCC Volume One.
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating a Performance Solution concerning energy efficiency of a Class 5
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions using the Green Star - Design and As Built
Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions using a NABERS Energy Commitment Agreement.
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning weatherproofing.
Summary of changes The NCC will be amended out-of-cycle prior to NCC 2019. This document details the clauses affected due to NCC 2016, Volume One Amendment 1.
Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:
Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:
Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:
Report This report outlines the principles and methodology used to develop the proposed residential heating and cooling load limits for all Nationwide House Energy Rating Scheme (NatHERS) climate z
This paper investigates the fatigue performance of the battens using analysis methods applied in studying cladding fatigue.
Provides guidance to apply the NCC evidence of suitability provisions across all volumes. It includes a framework and decision flow chart to assist in correct use of these provisions.