Displaying 64 - 84 of 104
This video provides the fundamentals of energy efficiency and how the NCC handles energy efficiency requirements across the Volumes.
The focus of this video is on the specific fire safety provisions in the NCC Volume One.
Provides guidance on facilitating access to buildings for telecommunications services.
Provides guidance to use the NCC indoor air quality (IAQ) Verification Methods.
Provides guidance to use the ABCB Standard for buildings in flood hazard areas.
This supporting documents assists in understanding the focus of changes being considered for the 2022 version of the National Construction Code (NCC 2022) in regards to:
Assists in understanding and applying Part J5.7, Pump System energy efficiency DTS Provisions.
This report estimates the potential construction costs for an accessible adult change facility in an existing modified BCA facility or a separated facility as specified below:
Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions using a NABERS Energy Commitment Agreement.
This Advisory Note explains the intent of the concessions in Specification C1.1, Clauses 3.10(a) and 4.3 (a) of NCC Volume One.
This Case Study outlines developing a DTS Solution for the energy efficiency of a small office building. It is based on the DTS Provisions in Section J of NCC Volume One.
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating a Performance Solution concerning energy efficiency of a Class 5
Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning weatherproofing.
This discussion paper was released in April 2014, it informed and sought feedback from stakeholders on the resilience of new buildings to extreme weather events.
Summary of changes The NCC will be amended out-of-cycle prior to NCC 2019. This document details the clauses affected due to NCC 2016, Volume One Amendment 1.
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions using the Green Star - Design and As Built
Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:
Advisory Note This Advisory Note relates to requirements for stairways, landings and ramps to have slip-resistant, non-skid or non-slip surfaces.
This report shows the results of a number of building models that compare the energy, cost and greenhouse gas emission reductions of buildings built to Deemed to Satisfy provisions of Section J NCC
Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes: