/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c3-protection
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/part-c3-protection-openings
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
Schedule of Products - Fittings – Metallic
/schedule-products-fittings-metallic
Schedule of Products - Fittings – Metallic
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Building Confidence Report Implementation Team
/initiatives/bcr-implementation-team
The BCR Implementation Team operates under the Australian Building Codes Board, and develops a National Framework for the consistent implementation of recommendations of the Building Confidence Report.
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
/editions/2019/ncc-2019-volume-two/list-amendments/list-amendments-ncc-2019-housing-provisions
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
This set of notes has been prepared by the Australian Building Codes Board to assist NCC users in identifying changes incorporated in the 2019 edition of the Housing Provisions (Volume Two of the NCC).
The notes provide a description of major…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/victoria/section-e-services-and-equipment
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part E1 Fire fighting equipment
Delete references to Class 3 building used as a residential care building and Class 9a health-care building used as a residential care building. Add references to residential care building (Vic) and shared accommodation…
/editions/2019/ncc-2019-volume-one/victoria/section-e-services-and-equipment
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part E1 Fire fighting equipment
Delete references to Class 3 building used as a residential care building and Class 9a health-care building used as a residential care building. Add references to residential care building (Vic) and shared accommodation…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-32-footings-and-slabs/part-325-footing-and
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Explanatory information:
Explanatory information:
The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not…
/editions/2019/ncc-2019-volume-two/part-32-footings-and-slabs/part-325-footing-and-slab-construction
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Explanatory information:
Explanatory information:
The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not covered by this Part then…
/editions/2016/ncc-2016-volume-two/part-32-footings-and-slabs/part-322-preparation
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
3.2.2.1 Excavation for footings
(a)
Excavation for footings, including thickenings for slabs and pads must be clean cut with vertical sides, wherever possible.
(b)
The base of the excavation must be—
(i)
for flat sites, generally level…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-32-footings-and-slabs/part-322-preparation
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
3.2.2.1 Excavation for footings
(a)
Excavation for footings, including thickenings for slabs and pads must be clean cut with vertical sides, wherever possible.
(b)
The base of the excavation must be—
(i)
for flat sites, generally…
/editions/2019/ncc-2019-volume-two/part-32-footings-and-slabs/part-322-preparation
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
3.2.2.1 Excavation for footings
(a)
Excavation for footings, including thickenings for slabs and pads must be clean cut with vertical sides, wherever possible.
(b)
The base of the excavation must be—
(i)
for flat sites, generally…
/editions/2016-a1/ncc-2016-volume-two/part-32-footings-and-slabs/part-322-preparation
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
3.2.2.1 Excavation for footings
(a)
Excavation for footings, including thickenings for slabs and pads must be clean cut with vertical sides, wherever possible.
(b)
The base of the excavation must be—
(i)
for flat sites, generally level…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-2-abbreviations-and-symbols/schedule-2
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Abbreviations and symbols used in the NCC include:
Abbreviations
Abbreviation
Definition
ABCB
Australian…
Demystifying the WaterMark technical file
/news/2021/demystifying-watermark-technical-file
Let’s look at what a technical file is and how it is used.
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
/news/2022/overview-changes-structural-safety
Here’s the key changes to structural safety for NCC 2022.
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/section-c-fire-resistance-performance
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
PERFORMANCE REQUIREMENTS
CP1
A building must have elements which will, to the degree necessary, maintain structural stability during a fire appropriate to—
(a)
the function or use of the building; and
(b)
the fire load; and
(c)
the…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/section-c-fire-resistance
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
PERFORMANCE REQUIREMENTS
CP1
A building must have elements which will, to the degree necessary, maintain structural stability during a fire appropriate to—
(a)
the function or use of the building; and
(b)
the fire load; and
(c)
the…
/news/2019/pca-how-use-and-navigate-online-version
With the improved digitisation of the NCC, using the Plumbing Code of Australia (PCA) online is much easier. Here’s some useful information, including some of our favourite features, to help you use the PCA online.
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID: