/editions/2019/ncc-2019-volume-one/schedule-4-referenced-documents/schedule-4-referenced-documents
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-two/schedule-4-referenced-documents/schedule-4-referenced-documents
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-three/schedule-4-list-reference-documents/schedule-4-referenced
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-4-list-reference-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-two/part-39-safe-movement-and-access/part-392-barriers-and-handrails
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with—
Performance…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-39-safe-movement-and-access/part-392-barriers
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with—
Performance…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c2-compartmentation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/part-c2-compartmentation-and-separation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/part-a3-classification-buildings
A3.1 Principles of classification
The classification of a building or part of a building is determined by the purpose for which it is designed, constructed or adapted to be used.
Intent
To state the basis of any decision regarding the…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F4.1
to F4.12; and
(ii)
for farm buildings and farm sheds, Part H3.
(b)…
/editions/2016/ncc-2016-volume-one/section-general-requirements/part-a3-classification-buildings-and
A3.1 Principles of classification
The classification of a building or part of a building is determined by the purpose for which it is designed, constructed or adapted to be used.
Intent
To state the basis of any decision regarding the…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation-deemed
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F4.1
to F4.12; and
(ii)
for farm buildings and farm sheds, Part H3.
(b)…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g1-minor-structures-and
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provision for this Performance Requirement.
Tas G1.0(b)
(b)
Where a Deemed-to-…
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/14-design-scenarios
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/14-design-scenarios
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements set out in Table 1.1.
The design…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/14-design-scenarios
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g1-minor-structures-and
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provision for this Performance Requirement.
Tas G1.0(b)
(b)
Where a Deemed-to-…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method
presents specific design
scenarios that must be considered in order to demonstrate that the fire safety aspects of a building
design…