/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019/ncc-2019-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venue other than temporary structures and drive-in theatres.…
/editions/2016-a1/ncc-2016-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venues other than temporary structures and drive-in theatres.…
/editions/2016/ncc-2016-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venues other than temporary structures and drive-in theatres.…
/editions/2019/ncc-2019-volume-two/part-39-safe-movement-and-access/part-392-barriers-and-handrails
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with—
Performance…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-39-safe-movement-and-access/part-392-barriers
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with—
Performance…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a23-fire-resistance
1. Scope
This Specification sets out the procedures for determining the FRL of building elements.
Deemed-to-Satisfy Provisions often require building elements to have an FRL. explains how these FRLs are to be determined and, in conjunction with…
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a23-fire-resistance
1. Scope
This Specification sets out the procedures for determining the FRL of building elements.
Deemed-to-Satisfy Provisions often require building elements to have an FRL. explains how these FRLs are to be determined and, in conjunction with…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?
Photoluminescence is the…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?
Photoluminescence is the…
/editions/2016-a1/ncc-2016-volume-two/part-37-fire-safety/part-371-fire-separation
Appropriate Performance Requirements
Appropriate
Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.1, that proposal must comply with—
P2.3.1
; and
the relevant Performance…
/editions/2016/ncc-2016-volume-two/part-37-fire-safety/part-371-fire-separation
Appropriate Performance Requirements
Appropriate
Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.1, that proposal must comply with—
P2.3.1
; and
the relevant Performance…
/news/2021/introducing-your-abcb-industry-board-members
The Australian Building Codes Board is made up of eighteen members including a Chair, the head of each state and territory building administration, a Commonwealth building policy representative, up to seven industry representatives, and a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided…
/resources/videos/retaining-walls
Can I still design a retaining wall to Part 3.0? Are the design life provisions of AS 4678 normative or informative? These questions are answered in this video.
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/nsw-part-h101-entertainment-venues
Note
Note
NSW Part H101 contains Deemed-to-Satisfy
Provisions additional to those contained in Sections C, D, E, F and G for
buildings containing or used as entertainment…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that Specification E4.8 provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that Specification E4.8 provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-d-access-and-egress/part-d1-provision
Deemed-to-Satisfy Provisions
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.17, D2.1 to D2.25 and D3.1…
/editions/2019/ncc-2019-volume-one/section-d-access-and-egress/part-d1-provision-escape
Deemed-to-Satisfy Provisions
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.17, D2.1 to D2.25 and D3.1…