/editions/2016-a1/ncc-2016-volume-one/tasmania/section-general-provisions
Tas A1.1 Definitions
Insert definition for centre-based care class 4 facilityas follows:
Centre-based care class 4 facility
is a facility as defined in Centre Based Care Class 4 Standards.
Insert definition for centre-based care class 5…
/editions/2016/ncc-2016-volume-one/tasmania/section-general-provisions
Tas A1.1 Definitions
Insert definition for centre-based care class 4 facilityas follows:
Centre-based care class 4 facility
is a facility as defined in Centre Based Care Class 4 Standards.
Insert definition for centre-based care class 5…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j6-artificial-lighting-and-power
J6.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j6-artificial
J6.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to…
/editions/2019/ncc-2019-volume-one/schedule-4-referenced-documents/schedule-4-referenced-documents
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-two/schedule-4-referenced-documents/schedule-4-referenced-documents
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-three/schedule-4-list-reference-documents/schedule-4-referenced
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-4-list-reference-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/14-design-scenarios
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/14-design-scenarios
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements set out in Table 1.1.
The design…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/14-design-scenarios
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g1-minor-structures-and
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provision for this Performance Requirement.
Tas G1.0(b)
(b)
Where a Deemed-to-…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g1-minor-structures-and
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provision for this Performance Requirement.
Tas G1.0(b)
(b)
Where a Deemed-to-…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method
presents specific design
scenarios that must be considered in order to demonstrate that the fire safety aspects of a building
design…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g1-minor-structures-and-dts
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provisio n for this Performance Requirement.
Tas G1.0(b)
(b)
Where a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g1-minor-dts
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provisio n for this Performance Requirement.
Tas G1.0(b)
(b)
Where a…