/editions/ncc-2022/adopted/volume-one/6-northern-territory/4-design-buildings-cyclonic-areas
NT S4C3 Strengthened area2019: Spec B1.2: NT3
Insert NT clause S4C3 in clause S4C3 as follows:
(1) Where a…
/editions/ncc-2022/adopted/volume-one/11-western-australia/4-design-buildings-cyclonic-areas
WA S4C1 Scope2019: Spec B1.2: 1
Delete subclause S4C1(2) and insert WA S4C1(2) as follows:
(2) For the purposes…
/editions/2016-a1/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3102
Appropriate Performance Requirements
Appropriate :
Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.2, that proposal must comply with—
; and
the relevant Performance Requirements determined in…
/editions/ncc-2022/adopted/housing-provisions/10-health-and-amenity/part-102-wet-area-waterproofing
10.2.1
Wet areas
2019: 3.8.1.2…
/editions/ncc-2022/adopted/housing-provisions/12-ancillary-provisions/part-122-construction-alpine-areas
12.2.1
Application
New for 2022…
/editions/ncc-2022/adopted/housing-provisions/8-south-australia/102-wet-area-waterproofing
SA 10.2.1 Wet areas2019: SA 3.8.1.2
Delete clause 10.2.1 and insert SA 10.2.1 as follows:
Building elements in…
/editions/2016/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3102
Appropriate Performance Requirements
Appropriate :
Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.2, that proposal must comply with—
; and
the relevant Performance Requirements determined in…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4
Performance Requirements
GP4.1 External doorways
An external doorway from a building in an alpine area must be installed so that opening the door is not obstructed by snow or ice.
Application
Application
GP4.1 applies to a building…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g6-occupiable
Note:
Note:
Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas.
G6.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply to…
/editions/ncc-2022/adopted/housing-provisions/11-western-australia/23-changes-asnzs-117022021-and-40552021
WA 2.3.1 ScopeNew for 2022
This Part sets out the changes necessary for Western Australia to the application of…
/editions/ncc-2022/adopted/housing-provisions/2-structure/wa-part-23-changes-asnzs-117022021-and-40552021
NCC Blurbs
This Part sets out the changes necessary for…
/editions/2016/ncc-2016-volume-two/part-38-health-and-amenity/part-381-wet-areas-and-external
Performance Requirements
Appropriate Performance Requirements:
Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part 3.8.1, that proposal…
/editions/ncc-2022/adopted/volume-one/f-health-and-amenity/part-f2-wet-areas-and-overflow-protection
Introduction to this Part
This Part is intended to minimise the risk of water from internal wet areas accumulating…
/editions/ncc-2022/adopted/volume-one/g-ancillary-provisions/part-g5-construction-bushfire-prone-areas
Introduction to this Part
This Part contains additional requirements for the construction of buildings located in…
/editions/2019/ncc-2019-volume-two/part-38-health-and-amenity/part-381-wet-areas-and-external
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part…
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.3, that proposal must comply with—
Performance RequirementP2.1.2; and…
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative alpine area egress design is proposed as a Performance Solution to that described in Part 3.10.4, that proposal must comply with—…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g5-construction-bushfire
Performance Requirements
NSW GP5.1
Qld GP5.1
Bushfire Verification Method
GP5.1 Bushfire resistance
A building that is constructed in a designated bushfire prone area must, to the degree necessary, be designed and constructed to…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-38-health-and-amenity/part-381-wet-areas-and
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part…