/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e15-fire
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that gives the design and installation details for sprinkler systems required by the Deemed-to-Satisfy Provisions…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e15-fire-sprinkler
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that gives the design and installation details for sprinkler systems required by the Deemed-to-Satisfy Provisions…
/news/2024/new-prefabricated-modular-and-offsite-construction-handbook
/editions/2016-a1/ncc-2016-volume-one/tasmania/section-general-provisions
Tas A1.1 Definitions
Insert definition for centre-based care class 4 facilityas follows:
Centre-based care class 4 facility
is a facility as defined in Centre Based Care Class 4 Standards.
Insert definition for centre-based care class 5…
/editions/2016/ncc-2016-volume-one/tasmania/section-general-provisions
Tas A1.1 Definitions
Insert definition for centre-based care class 4 facilityas follows:
Centre-based care class 4 facility
is a facility as defined in Centre Based Care Class 4 Standards.
Insert definition for centre-based care class 5…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j6-artificial
J6.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j6-artificial-lighting-and-power
J6.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-one/schedule-4-referenced-documents/schedule-4-referenced-documents
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-two/schedule-4-referenced-documents/schedule-4-referenced-documents
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019/ncc-2019-volume-three/schedule-4-list-reference-documents/schedule-4-referenced
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-4-list-reference-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f5-sound-transmission-and
F5.0 Deemed-to-Satisfy Provisions
NT Part F5
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with F5.1 to F5.7.
(b)
Where a Performance Solution is proposed, the relevant…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f5-sound-transmission-and
F5.0 Deemed-to-Satisfy Provisions
NT Part F5
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with F5.1 to F5.7.
(b)
Where a Performance Solution is proposed, the relevant…
/resource/understanding-ncc/ncc-2022-new-consistent-volume-structure-supporting-document-attachment
NCC 2022 comes with important changes to its structure and format, as part of the ABCB's commitment to delivering an NCC that is user-friendly and modern. This attachment provides the history of the evolution of the code's volume structure.…
NCC-supporting-document-CVS-attach-A-2022.pdf
(405.17 KB)
/resource/understanding-ncc/ncc-2022-new-sptc-referencing-system-supporting-document-attachment-evolution-codes-referencing
NCC 2022 comes with important changes to its structure and format, as part of the ABCB's commitment to delivering an NCC that is user-friendly and modern. This attachment provides the history of the evolution of the code's referencing system…
Public record: Board Meeting 2025 - 4
/about/board/public-record-board-meeting-2025-4
The aim of this Public Record is to share information about the matters being considered at each Board meeting. Some matters need to remain confidential due to specific confidentiality requirements or being part of a government/ministerial decision…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e15
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that Specification E1.5 gives the design and installation details for sprinkler systems required by the Deemed-to-…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f5-sound-dts
NT Part F5
Deemed-to-Satisfy Provisions
F5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP5.1 to FP5.6 are satisfied by complying with F5.1 to F5.7.
(b)
Where a…