/editions/ncc-2022/adopted/volume-one/11-western-australia/i4-public-buildings
Introduction to this Part
WA Part I4 contains Deemed-to-Satisfy Solutions for WA public buildings that are…
/editions/ncc-2022/adopted/volume-one/i-special-use-buildings/wa-part-i4-public-buildings
Introduction to this Part
WA Part I4 contains Deemed-to-Satisfy Solutions for WA public buildings that are…
/editions/ncc-2022/adopted/volume-two/11-western-australia/h9-water-use
Introduction to this Part
This Part contains requirements for reducing water use.
/editions/ncc-2022/adopted/volume-two/h-class-1-and-10-buildings/wa-part-h9-water-use
Introduction to this Part
This Part contains requirements for reducing water use.
/editions/2019/ncc-2019-volume-one/western-australia/wa-part-h101-public-buildings
Note:
Note:
WA Part H101 contains Deemed-to-Satisfy Solutions for WA public buildings that are additional to those contained in Sections D, F and H.
WA H101.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is…
/editions/ncc-2022/adopted/volume-one/11-western-australia/wa-footnote-other-legislation-affecting-buildings
In addition to any applicable provisions of the Building Act 2011, Building Regulations 2012 and this Code, there…
/editions/ncc-2022/adopted/volume-two/11-western-australia/wa-footnote-other-legislation-affecting-buildings
In addition to any applicable provisions of the Building Act 2011, Building Regulations 2012 and this Code, there…
/editions/ncc-2022/adopted/volume-three/11-western-australia/wa-footnote-other-legislation-affecting-buildings
In addition to any applicable provisions of the Plumbers Licensing Act 1995, Plumbers Licensing and Plumbing…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/western-australia/wa-part-h101-public-buildings
Note:
Note:
WA Part H101 contains Deemed-to-Satisfy Solutions for WA public buildings that are additional to those contained in Sections D, F and H.
WA H101.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is…
/news/2025/consultation-open-national-voluntary-certification-scheme-manufacturers-modern-methods-construction
/editions/ncc-2022/adopted/volume-one/11-western-australia/b2-changes-asnzs-117022021
Introduction to this Part
This Part sets out the changes necessary to the application of AS/NZS 1170.2:2021 in…
/editions/ncc-2022/adopted/volume-one/b-structure/wa-part-b2-changes-asnzs-117022021
Introduction to this Part
This Part sets out the changes necessary to the application of AS/NZS 1170.2:2021 in…
/editions/ncc-2022/adopted/housing-provisions/11-western-australia/23-changes-asnzs-117022021-and-40552021
WA 2.3.1 ScopeNew for 2022
This Part sets out the changes necessary for Western Australia to the application of…
/editions/ncc-2022/adopted/housing-provisions/2-structure/wa-part-23-changes-asnzs-117022021-and-40552021
NCC Blurbs
This Part sets out the changes necessary for…
/news/2020/plumbing-performance-solutions-western-australia
On 1 May 2015, Western Australia (WA) adopted the Plumbing Code of Australia (PCA) as the primary technical compliance standard for plumbing work.
/editions/2016/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/editions/2016-a1/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f6-condensation-management
Performance Requirements
FP6.1 Condensation and water vapour management
In a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, risks associated with water vapour and condensation must be managed to minimise their impact on…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f6-condensation
Performance Requirements
FP6.1 Condensation and water vapour management
In a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, risks associated with water vapour and condensation must be managed to minimise their impact on…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/specification-c11-fire-resisting
1. Scope
This Specification contains requirements for the fire-resisting construction of building elements.
Intent
To clarify that Specification C1.1 contains requirements for fire-resisting construction of building elements.
Note that…