/editions/ncc-2022/adopted/housing-provisions/10-health-and-amenity/part-102-wet-area-waterproofing
10.2.1
Wet areas
2019: 3.8.1.2…
/editions/ncc-2022/adopted/housing-provisions/12-ancillary-provisions/part-122-construction-alpine-areas
12.2.1
Application
New for 2022…
/editions/ncc-2022/adopted/volume-one/b-structure/4-design-buildings-cyclonic-areas
S4C1
Scope
2019: Spec B1.2: 1…
/editions/ncc-2022/adopted/volume-one/g-ancillary-provisions/part-g4-construction-alpine-areas
Accident potential from combustion heaters: Due to the extreme cold, the use of open-fire places and other heating devices is common. This increases the potential for accidents and the possibility of fire.
Sub-zero temperatures: Buildings constructed in…
Introduction to this Part
This Part contains additional requirements for buildings constructed in an alpine area to…
/editions/ncc-2022/adopted/volume-one/g-ancillary-provisions/part-g6-occupiable-outdoor-areas
Introduction to this Part
This Part provides additional Deemed-to-Satisfy Provisions for buildings that include an…
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.2, that proposal must comply with—
Performance…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-310-ancillary-provisions-and-additional/p3.10.2
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.2, that proposal must comply with—
Performance…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4
Performance Requirements
GP4.1 External doorways
An external doorway from a building in an alpine area must be installed so that opening the door is not obstructed by snow or ice.
Application
Application
GP4.1 applies to a building…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g6-occupiable
Note:
Note:
Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas.
G6.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply to…
/editions/ncc-2022/adopted/housing-provisions/11-western-australia/23-changes-asnzs-117022021-and-40552021
WA 2.3.1 ScopeNew for 2022
This Part sets out the changes necessary for Western Australia to the application of…
/editions/ncc-2022/adopted/housing-provisions/2-structure/wa-part-23-changes-asnzs-117022021-and-40552021
NCC Blurbs
This Part sets out the changes necessary for…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g5-construction-bushfire
Performance Requirements
NSW GP5.1
Qld GP5.1
Bushfire Verification Method
GP5.1 Bushfire resistance
A building that is constructed in a designated bushfire prone area must, to the degree necessary, be designed and constructed to…
/resource/handbook/construction-buildings-flood-hazard-areas-handbook
Provides an understanding of the provisions in the ABCB Standard for Construction of Buildings in Flood Hazard Areas. Offers additional advisory information outside the scope of the Standard. This handbook should be read in conjunction with the ABCB…
Handbook-flood-2012.pdf
(5.6 MB)
/editions/2016/ncc-2016-volume-two/part-38-health-and-amenity/part-381-wet-areas-and-external
Performance Requirements
Appropriate Performance Requirements:
Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part 3.8.1, that proposal…
/editions/2016/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3101-high-wind
Performance Requirements
Appropriate Performance Requirements:
Where an alternative method of constructing in high wind areas is proposed as a Performance Solution to that described in Part 3.10.1, that proposal must comply with—
P2.1.1; and
the…
/editions/2016/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3103-flood
Appropriate Performance Requirements
Appropriate Performance Requirements:
Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.3, that proposal must comply with—
; and
the relevant Performance…
/editions/ncc-2022/adopted/volume-one/5-new-south-wales/g5-construction-bushfire-prone-areas
NSW G5P1 Bushfire resistance2019: NSW GP5.1
Delete clause G5P1 and insert NSW G5P1 as follows:
A building that…
/editions/ncc-2022/adopted/volume-one/7-queensland/g5-construction-bushfire-prone-areas
QLD G5P1 Bushfire resistance2019: QLD GP5.1
Delete clause G5P1 and insert QLD G5P1 as follows:
A building that…
/editions/ncc-2022/adopted/volume-one/8-south-australia/f2-wet-areas-and-overflow-protection
SA F2P1 Wet area overflows2019: SA FP1.6
Delete clause F2P1 and insert SA F2P1 as follows:
Overflow from a…