Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark
Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. Roles and responsibilities
      5. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9. (b) Where a Performance Solution is proposed, the relevant Performance…
Scoping study of condensation in residential buildings
/resource/report/scoping-study-condensation-residential-buildings

Provides an overview of condensation in residential buildings, and discussions about why condensation risk, and occurrences of condensation and mould may be increasing within current Australian residential buildings. Please note: ‘Appendix 02 - Survey…

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Scoping-study-of-condensation-residential-buildings.pdf (1.88 MB)
Additional webinar session added for the 2022 NCC Seminars – Volume Three
/news/2022/additional-webinar-session-added-2022-ncc-seminars-volume-three

Due to popular demand we are offering a second webinar session.

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Accessible Housing- Estimated cost impact of proposed changes to NCC
/resource/report/accessible-housing-estimated-cost-impact-proposed-changes-ncc

This updated report presents an order of cost estimate for the proposed changes to the National Construction Code of Australia (NCC) to include mandatory minimum accessible housing provisions for new Class 1a (single residential) and Class 2 (…

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Accessible-housing-estimated-cost-impact-of-proposed-changes-to-NCC.pdf (2.68 MB)
Fire safety in High Rise Buildings
/news/2017/fire-safety-high-rise-buildings

A lot has been said and debated about the recent Grenfell Tower apartments’ fire in London. It is not intended to repeat or extend that here

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Section C Fire Resistance (Verification Methods)
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/section-c-fire-resistance
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
VERIFICATION METHODS CV1 Compliance with CP2(a)(iii) to avoid the spread of fire between buildings on adjoining allotments is verified when it is calculated that— (a) a building will not cause heat flux in excess of those set out in column 2 of…
Comprehensive package of measures for fire safety
/news/2017/comprehensive-package-measures-fire-safety

In late 2016, following substantial analysis of a range of options responding to the Lacrosse fire, the ABCB developed, and the Building Ministers’ Forum agreed, to a comprehensive package of measures.

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part G4 Construction in alpine areas (DtS)
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with— (i) G4.1 to G4.9; and (ii) for a…
Part G4 Construction in alpine areas (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied…
Part 3.10.1 High Wind Areas
/editions/2016-a1/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3101-high
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Performance Requirements Appropriate Performance Requirements: Where an alternative method of constructing in high wind areas is proposed as a Performance Solution to that described in Part 3.10.1, that proposal must comply with— P2.1.1; and the…
Part 3.10.1 High Wind Areas
/editions/2016/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3101-high-wind
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Performance Requirements Appropriate Performance Requirements: Where an alternative method of constructing in high wind areas is proposed as a Performance Solution to that described in Part 3.10.1, that proposal must comply with— P2.1.1; and the…
Schedule of Products - Heated Water Products
/schedule-products-heated-water-products

Schedule of Products - Heated Water Products

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
ACT 7.1.2 Heating and Cooling Loads
/editions/2016-a1/ncc-2016-volume-two/australian-capital-territory/act-712-heating-and-cooling-loads
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
(a) Subject to (b) to (e), 3.12.0(a)(i) may apply to— (i) a whole dwelling as added to or as extended; or (ii) a house-like addition or extension as if 3.12.0.1 expressly indicated it applied to a large part of a building and as if the…
ACT 7.1.2 Heating and Cooling Loads
/editions/2016/ncc-2016-volume-two/australian-capital-territory/act-712-heating-and-cooling-loads
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
(a) Subject to (b) to (e), 3.12.0(a)(i) may apply to— (i) a whole dwelling as added to or as extended; or (ii) a house-like addition or extension as if 3.12.0.1 expressly indicated it applied to a large part of a building and as if the…
Actions to be taken on Fire Safety in High Rise Buildings
/news/2016/actions-be-taken-fire-safety-high-rise-buildings
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
At the Building Ministers' Forum (BMF) of 19…Review the evidence of suitability provisions in…Work with the Working Group of Senior Officers…
ABCB Board member profile: Rolph Vos
/news/2019/abcb-board-member-profile-rolph-vos

Connect regularly features the profile of a member of the ABCB Board. This issue introduces Rolph Vos, Australian Local Government Board member and talks about his role on the Board, emerging issues and challenges working within the industry.

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Specification A1.1 Fire-Protected Timber
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. Intent To set out the requirements…
Specification A1.1 Fire-Protected Timber
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. Intent To set out the requirements…
2022 NCC Seminars: Volume Two - Attachment of Framed Decks
/resources/videos/2022-ncc-seminars-volume-two-attachment-framed-decks

This video from the 2022 NCC Seminars discusses Part 12.3 Attachment of framed decks and balconies to external walls of buildings using a waling plate from NCC 2022 Housing Provisions.

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Specification E3.1 Lift installations
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e31
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10

Areas of Interest

  • Health and amenity (9)
  • Energy efficiency (7)
  • Access and egress (5)
  • Fire safety (4)
  • Performance (4)
  • Structural safety (4)
  • Building services (3)
  • NCC compliance (2)
  • Plumbing and drainage (2)
  • Water services (2)

Content type

  • NCC Page (798)
  • Article (51)
  • Resource (21)
  • Page (16)
  • Video (8)
  • NCC Section (5)
  • PCD (5)
  • NCC Navigator Page (4)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube