Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark

NCC 2022 online services are temporarily affected

We are working to fix some display issues with NCC 2022 online. You can still download each volume via the editions page. We apologise for any inconvenience. 

Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Part J8 Facilities for Energy Monitoring
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/part-j8-facilities-energy
J8.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with— (i) J0.1 to J0.3; and (ii) J1.1 to J1.6; and (iii) J2.1 to J2.5; and…
Specification B1.2 Design of buildings in cyclonic areas
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-b-structure/specification-b12-design
1. Scope This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2. For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
Specification B1.2 Design of buildings in cyclonic areas
/editions/2019/ncc-2019-volume-one/section-b-structure/specification-b12-design-buildings-cyclonic
1. Scope This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2. For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
Designing for childcare in high rise buildings
/news/2018/designing-childcare-high-rise-buildings

The increasing demand for childcare coupled with long working hours for parents are giving rise to the need for CBD based childcare.

Specification A1.1 Fire-Protected Timber
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. Intent To set out the requirements…
Specification A1.1 Fire-Protected Timber
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. Intent To set out the requirements…
Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9. (b) Where a Performance Solution is proposed, the relevant Performance…
Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9. (b) Where a Performance Solution is proposed, the relevant Performance…
Report Cost implications of proposals to amend DTS Provisions
/resource/report/report-cost-implications-proposals-amend-dts-provisions

This report provides commentary on the cost implications of a range of proposed Deemed-to-Satisfy provisions emanating from the Emergency Egress for all Occupants Project. This report was prepared for the ABCB by Rider Levett Bucknall (RLB) in order to…

Report-cost-implications-proposals-amend-DtS-provisions.pdf (731.9 KB)
Specification E3.1 Lift Installations
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift Installations
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift installations
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e31
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift installations
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Thermal bridging in commercial buildings
/ncc-navigator/thermal-bridging-commercial-buildings

This NCC Navigator provides an introduction to thermal bridging and how the NCC addresses it for commercial buildings in NCC Volume One. It explains how to account for thermal bridges when calculating the Total R-Value of certain construction types.…

Part G6 Occupiable outdoor areas
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g6-occupiable-outdoor-areas
Note: Note: Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas. G6.1 Application of Part (a) The Deemed-to-Satisfy Provisions of this Part apply to…
Specification C1.13a Fire-protected timber
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c113a-fire
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded…
Part G6 Occupiable outdoor areas
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g6-occupiable
Note: Note: Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas. G6.1 Application of Part (a) The Deemed-to-Satisfy Provisions of this Part apply to…
Specification C1.13a Fire-protected timber
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c113a-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. 2. Requirements 2.1…
Section H Special Use Buildings (H101 to H112)
/editions/2016/ncc-2016-volume-one/tasmania/section-h-special-use-buildings-h101-h112
Tas Part H101 * * * * * Blank clause This Part has deliberately been left blank. After Tas Part H101 insert Tas Part H102 as follows: Tas Part H102 Food Premises PERFORMANCE REQUIREMENTS Tas H102 P1 The design and…
Section H Special Use Buildings (H101 to H112)
/editions/2016-a1/ncc-2016-volume-one/tasmania/section-h-special-use-buildings-h101-h112
Tas Part H101 * * * * * Blank clause This Part has deliberately been left blank. After Tas Part H101 insert Tas Part H102 as follows: Tas Part H102 Food Premises PERFORMANCE REQUIREMENTS Tas H102 P1 The design and…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Health and amenity (4)
  • Access and egress (3)
  • Energy efficiency (3)
  • Performance (3)
  • Structural safety (2)
  • Building services (1)
  • Fire safety (1)

Content type

  • NCC Page (291)
  • Article (23)
  • Resource (14)
  • Page (10)
  • NCC Navigator Page (2)
  • PCD (1)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube