/editions/2019-a1/ncc-2019-volume-one-amendment-1/victoria/schedule-3-definitions
Vary Schedule 3 as follows:
Vic Schedule 3 Definitions
Add the definition of children’s service as follows:
Children’s service
has the same meaning as it has under the Children's Services Act 1996, but excludes a service where education and…
/editions/2019/ncc-2019-volume-one/victoria/schedule-3-definitions
Vary Schedule 3 as follows:
Vic Schedule 3 Definitions
Add the definition of children’s service as follows:
Children’s service
has the same meaning as it has under the Children's Services Act 1996, but excludes a service where education and…
/editions/2016-a1/ncc-2016-volume-one/victoria/section-general-provisions
Part A1 Interpretation
Vary A1.1 as follows:
Vic A1.1 Definitions
Add the definition of “children’s service” as follows:
Children’s service
has the same meaning as it has under the Children's Services Act 1996, but excludes a service where…
/editions/2016/ncc-2016-volume-one/victoria/section-general-provisions
Part A1 Interpretation
Vary A1.1 as follows:
Vic A1.1 Definitions
Add the definition of “children’s service” as follows:
Children’s service
has the same meaning as it has under the Children's Services Act 1996, but excludes a service where…
Installation and WaterMark Licensing
/plumbers/installation-and-watermark-licensing
If a product listed on the WaterMark Schedule of Products, it must be WaterMark certified and installed by a licenced plumber.
/editions/2019/ncc-2019-volume-three/victoria/vic-section-h-low-risk-site-liquid-trade-waste-systems
Vic Part H1 Low risk on-site liquid trade waste systems
Vic Introduction to this Part
This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a low risk on…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/victoria/vic-section-h-low-risk-site-liquid
Vic Part H1 Low risk on-site liquid trade waste systems
Vic Introduction to this Part
This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a low risk on…
/editions/2016/ncc-2016-volume-two/australian-capital-territory/act-714-external-glazing-application
(a)
Subject to (b), in applying Part 3.12.2 to an addition or extension all glazing on the respective storey, including the addition or extension and any existing glazing in the unaltered part of the storey, must be assessed where Part 3.12.2…
/editions/2016-a1/ncc-2016-volume-two/australian-capital-territory/act-714-external-glazing
(a)
Subject to (b), in applying Part 3.12.2 to an addition or extension all glazing on the respective storey, including the addition or extension and any existing glazing in the unaltered part of the storey, must be assessed where Part 3.12.2…
What is WaterMark?
/consumers/what-watermark
Did you know that all plumbing and drainage products listed on the WaterMark Schedule of Products must be WaterMark certified, before it can be installed by a licensed plumber? This is required by law in Volume Three of the National Construction Code (…
Schedule of Products - Fittings – Other
/schedule-products-fittings-other
Schedule of Products - Fittings – Other
Schedule of Products - Sanitary fixtures
/schedule-products-sanitary-fixtures
Schedule of Products - Sanitary fixtures
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/specification-c11-fire-resisting
1. Scope
This Specification contains requirements for the fire-resisting construction of building elements.
Intent
To clarify that Specification C1.1 contains requirements for fire-resisting construction of building elements.
Note that…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c11-fire
1. Scope
This Specification contains requirements for the fire-resisting construction of building elements.
Intent
To clarify that Specification C1.1 contains requirements for fire-resisting construction of building elements.
Note that…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/specification-c11-fire-resisting
1. Scope
This Specification contains requirements for the fire-resisting construction of building elements.
Intent
To clarify that Specification C1.1 contains requirements for fire-resisting construction of building elements.
Note that…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/section-c-fire-resistance
VERIFICATION METHODS
CV1
Compliance with CP2(a)(iii) to avoid the spread of fire between buildings on adjoining allotments is verified when it is calculated that—
(a)
a building will not cause heat flux in excess of those set out in column 2 of…
/editions/2016-a1/ncc-2016-volume-one/new-south-wales/section-c-fire-resistance
Part C1 Fire Resistance and Stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as follows:
NSW C1.10 Fire hazard properties
(a)
The fire hazard properties of the following…
/editions/2016/ncc-2016-volume-one/new-south-wales/section-c-fire-resistance
Part C1 Fire Resistance and Stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as follows:
NSW C1.10 Fire hazard properties
(a)
The fire hazard properties of the following…
/news/2024/better-way-find-information-you-need
As part of the ongoing improvements to our website, we have launched an enhanced search function.