/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g6-occupiable
Note:
Note:
Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas.
G6.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply to…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c113a-fire-protected
1. Scope
This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded.
2. Requirements
2.1…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j8-facilities-energy-monitoring
J8.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j8-facilities
J8.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2019/ncc-2019-volume-one/tasmania/schedule-4-referenced-documents
Tas Schedule 4 Referenced documents
All legislation referenced in this Appendix is Tasmanian State legislation unless noted otherwise.
All referenced documents including legislation, codes, Australian Standards, guidelines and codes of practice are…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/schedule-4-referenced-documents
Tas Schedule 4 Referenced documents
All legislation referenced in this Appendix is Tasmanian State legislation unless noted otherwise.
All referenced documents including legislation, codes, Australian Standards, guidelines and codes of practice are…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
EP4.1
To facilitate safe evacuation in an emergency, a building must be provided with a system that—
(a)
ensures a level of visibility sufficient to enable exits, paths of travel to exits and any obstacles along a path of travel to an exit to…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
EP4.1
To facilitate safe evacuation in an emergency, a building must be provided with a system that—
(a)
ensures a level of visibility sufficient to enable exits, paths of travel to exits and any obstacles along a path of travel to an exit to…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
Requirements GP4.1 to
GP4.4 are satisfied…
/editions/2016-a1/ncc-2016-volume-two/australian-capital-territory/act-71-energy-efficiency-building
Application
Application:
ACT Part 7.1 applies to work in relation to adding to or extending a completed building that can be lawfully occupied or used, where there is not otherwise a requirement to bring into BCA compliance the unaltered…
/editions/2016-a1/ncc-2016-volume-three/section-general-provisions/part-a0-application
A0.1 Compliance with the NCC
Compliance with the NCC is achieved by satisfying the Performance Requirements.
A0.2 Scope
(a)
Sections B to F of NCC Volume Three – the Plumbing Code of Australia (PCA) contain the requirements for the design,…
/editions/2016/ncc-2016-volume-two/australian-capital-territory/act-71-energy-efficiency-building
Application
Application:
ACT Part 7.1 applies to work in relation to adding to or extending a completed building that can be lawfully occupied or used, where there is not otherwise a requirement to bring into BCA compliance the unaltered…
/editions/2016/ncc-2016-volume-three/section-general-provisions/part-a0-application
A0.1 Compliance with the NCC
Compliance with the NCC is achieved by satisfying the Performance Requirements.
A0.2 Scope
(a)
Sections B to F of NCC Volume Three – the Plumbing Code of Australia (PCA) contain the requirements for the design,…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f3-room-heights
Performance Requirements
FP3.1 Room or space heights
A habitable room or space must have sufficient height that does not unduly interfere with its intended function.
The Objective of this Part is to safeguard occupants from injury or loss of…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f3-room-heights
Performance Requirements
FP3.1 Room or space heights
A habitable room or space must have sufficient height that does not unduly interfere with its intended function.
The Objective of this Part is to safeguard occupants from injury or loss of…
Schedule of Products - Heated Water Products
/schedule-products-heated-water-products
Schedule of Products - Heated Water Products
/editions/2016/ncc-2016-volume-two/introduction/introduction
THE NATIONAL CONSTRUCTION CODE
The National Construction Code (NCC) is an initiative of the Council of Australian Governments developed to incorporate all on-site construction requirements into a single code.
The NCC is produced and maintained…
/editions/2016-a1/ncc-2016-volume-two/introduction/introduction
THE NATIONAL CONSTRUCTION CODE
The National Construction Code (NCC) is an initiative of the Council of Australian Governments developed to incorporate all on-site construction requirements into a single code.
The NCC is produced and maintained…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
Performance Requirements
EP4.1 Visibility in an emergency
To facilitate safe evacuation in an emergency, a building must be provided with a system that—
(a)
ensures a level of visibility sufficient to enable exits, paths of travel to exits and…