/editions/2016/ncc-2016-volume-two/part-37-fire-safety/part-375-alpine-areas
Performance Requirements
Appropriate Performance Requirements
Where an alternative alpine area egress design is proposed as a Performance Solution to that described in Part 3.7.5, that proposal must comply with—
; and
the relevant…
/editions/2016-a1/ncc-2016-volume-two/part-37-fire-safety/part-375-alpine-areas
Performance Requirements
Appropriate Performance Requirements
Where an alternative alpine area egress design is proposed as a Performance Solution to that described in Part 3.7.5, that proposal must comply with—
; and
the relevant…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope
This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations.
2. Lift cars exposed to solar radiation
(a)
A lift car exposed to solar radiation directly, or…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope
This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations.
2. Lift cars exposed to solar radiation
(a)
A lift car exposed to solar radiation directly, or…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e31
1. Scope
This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations.
2. Lift cars exposed to solar radiation
(a)
A lift car exposed to solar radiation directly, or…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope
This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations.
2. Lift cars exposed to solar radiation
(a)
A lift car exposed to solar radiation directly, or…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
VERIFICATION METHODS
FV1 Weatherproofing
(a)
Compliance with for weatherproofing of an external wall— that
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table FV1.1; and
(ii…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
VERIFICATION METHODS
FV1 Weatherproofing
(a)
Compliance with for weatherproofing of an external wall— that
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table FV1.1; and
(ii…
/editions/2019/ncc-2019-volume-two/section-2-performance-provisions/part-22-damp-and-weatherproofing
Explanatory information:
Explanatory information:
Objective
O2.2
The Objective is to—
safeguard occupants from illness or injury and protect the building from damage caused by—
surface water; and
external moisture entering a…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/section-2-performance-provisions/part-22-damp-and
Explanatory information:
Explanatory information:
Objective
O2.2
The Objective is to—
safeguard occupants from illness or injury and protect the building from damage caused by—
surface water; and
external moisture entering a…
Scoping study of condensation in residential buildings appendices
/resource/report/scoping-study-condensation-residential-buildings-appendices
Appendices 1-8 This document contains the appendices that are referred to in the Scoping study of Condensation in Residential Buildings. Please note: 'Appendix 02 - Survey Part 2 - Stats analysis of all questions' has not been included in…
/editions/2019/ncc-2019-volume-two/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
Energy Efficiency NCC Volume Two
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
Energy Efficiency NCC Volume Two
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1…
/editions/2016-a1/ncc-2016-volume-two/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1.
(b)
Air movement required by (a) may be…
/editions/2016/ncc-2016-volume-two/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1.
(b)
Air movement required by (a) may be…
/editions/2016/ncc-2016-volume-one/section-h-special-use-buildings/part-h1-class-9b-buildings
Note
Note.
Part H1 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Class 9b buildings.
H1.1 Application of Part
NSW H1.1
(a)
The Deemed-to-Satisfy Provisions of this Part apply…
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/part-h1-class-9b-buildings
Note
Note.
Part H1 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Class 9b buildings.
H1.1 Application of Part
NSW H1.1
(a)
The Deemed-to-Satisfy Provisions of this Part apply…
/resource/report/energy-action-modelling-and-sensitivity-analysis
This report shows the results of a number of building models that compare the energy, cost and greenhouse gas emission reductions of buildings built to Deemed to Satisfy provisions of Section J NCC 2016 with those built to Section J NCC 2019. It was…
/resource/report/sanitary-plumbing-drainage-and-pipe-sizing
Report The ABCB commissioned Lucid Consulting Australia to undertake a review of sanitary plumbing and drainage standards BS EN 12056-2:200 and BS EN 752:2017. The report investigates the suitability of using these plumbing and drainage pipe sizing…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvb-modelling
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…