/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/part-e4-dts
Deemed-to-Satisfy Provisions
E4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements EP4.1 to EP4.3 are satisfied by complying with—
(i)
E4.1 to E4.9; and
(ii)
in a…
/news/2026/modernising-national-construction-code
Help shape the future of the National Construction Code (NCC). The discussion paper is now open for public consultation.
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f5-sound-transmission-and
F5.0 Deemed-to-Satisfy Provisions
NT Part F5
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with F5.1 to F5.7.
(b)
Where a Performance Solution is proposed, the relevant…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f5-sound-transmission-and
F5.0 Deemed-to-Satisfy Provisions
NT Part F5
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with F5.1 to F5.7.
(b)
Where a Performance Solution is proposed, the relevant…
/news/2022/energy-efficiency-performance-ncc-2022
Big changes are included for energy efficiency in NCC 2022 – do you know what this means for Performance Solutions?
/news/2020/allowable-encroachments-how-close-too-close
Did you know that NCC Volume Two contains requirements relevant to plumbers, gas-fitters and air-conditioning installers?
ABCB Board member profile: Rolph Vos
/news/2019/abcb-board-member-profile-rolph-vos
Connect regularly features the profile of a member of the ABCB Board. This issue introduces Rolph Vos, Australian Local Government Board member and talks about his role on the Board, emerging issues and challenges working within the industry.
/editions/2016-a1/ncc-2016-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
3.12.2.1 External glazing
(a)
The aggregate conductance of the glazing in each storey, including any…
/editions/2016/ncc-2016-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
3.12.2.1 External glazing
(a)
The aggregate conductance of the glazing in each storey, including any…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f5-sound-transmission-and-dts
NT Part F5
Deemed-to-Satisfy Provisions
F5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP5.1 to FP5.6 are satisfied by complying with F5.1 to F5.7.
(b)
Where a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f5-sound-dts
NT Part F5
Deemed-to-Satisfy Provisions
F5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP5.1 to FP5.6 are satisfied by complying with F5.1 to F5.7.
(b)
Where a…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-j15b-spandrel-panel
1. Scope
This Specification describes methods of determining the thermal performance of spandrel panels.
Intent
To detail how to calculate the thermal performance of spandrel panels.
2. Spandrel panel R-Value: Calculation method 1
Spandrel…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-j15b
1. Scope
This Specification describes methods of determining the thermal performance of spandrel panels.
Intent
To detail how to calculate the thermal performance of spandrel panels.
2. Spandrel panel R-…
Schedule of Products - Jointing products
/schedule-products-jointing-products
Schedule of Products - Jointing products
/news/2020/ncc-2022-new-sptc-referencing-system
Here’s what to expect with the code’s new referencing system, dubbed SPTC: ‘Section - Part - Type - Clause’.
/editions/2019/ncc-2019-volume-one/south-australia/section-e-services-and-equipment
E1.3 is varied by adding SA E1.3(c), (d), (e) and (f) as follows:
SA E1.3 Fire hydrants
(c)
In a farm building, in lieu of providing a fire hydrant system in accordance with E1.3(b)(i), the building may be provided with—
(i)
a fire hydrant…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-e-services-and-equipment
E1.3 is varied by adding SA E1.3(c), (d), (e) and (f) as follows:
SA E1.3 Fire hydrants
(c)
In a farm building, in
lieu of providing a fire hydrant system in accordance with E1.3(b)(i…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/part-j2-glazing
J2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/part-j2-glazing
J2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvb-modelling
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…