/editions/2019/ncc-2019-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venue other than temporary structures and drive-in theatres.…
/resource/case-study/lighting-refurbishment-office-building
This Case Study outlines developing a DTS Solution for the energy efficiency of an interior lighting refurbishment for an office building. It is based on the DTS Provisions in Section J, Part J6 Artificial lighting in NCC Volume One.
The…
/editions/2019/ncc-2019-volume-one/section-d-access-and-egress/specification-d310-accessible-water
1. Scope
This Specification sets out the requirements for types of accessible water entry/exit for swimming pools.
Intent
To clarify that Specification D3.10 provides the design and installation details for accessible water entry/exit for…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/specification-d310-accessible-water
1. Scope
This Specification sets out the requirements for types of accessible water entry/exit for swimming pools.
Intent
To clarify that provides the design and installation details for accessible water entry/exit for swimming pools. must be…
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/specification-d310-accessible
1. Scope
This Specification sets out the requirements for types of accessible water entry/exit for swimming pools.
Intent
To clarify that provides the design and installation details for accessible water entry/exit for swimming pools. must be…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-d-access-and-egress/specification-d310
1. Scope
This Specification sets out the requirements for types of accessible water entry/exit for swimming pools.
Intent
To clarify that Specification D3.10 provides the design and installation details for accessible water entry/exit for…
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and-weatherproofing
VERIFICATION METHODS
V2.2.1 Weatherproofing
(a)
Compliance with for the weatherproofing of an external wall that—
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
/editions/2016-a1/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and
VERIFICATION METHODS
V2.2.1 Weatherproofing
(a)
Compliance with for the weatherproofing of an external wall that—
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/nsw-part-h101-entertainment-venues
Note
Note
NSW Part H101 contains Deemed-to-Satisfy
Provisions additional to those contained in Sections C, D, E, F and G for
buildings containing or used as entertainment…
Look for the WaterMark - Database Campaign
/look-watermark-database-campaign
The LOOK for the WaterMark campaign is an important first step in a broader strategy to raise awareness of the WaterMark Certification Scheme (WaterMark).
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j15-wall-construction
1. Scope
This Specification describes the thermal performance of some common forms of external wall construction.
Intent
To clarify that outlines the thermal performance of some of the more common forms of wall construction.
2.…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j15-wall
1. Scope
This Specification describes the thermal performance of some common forms of external wall construction.
Intent
To clarify that outlines the thermal performance of some of the more common forms of wall construction.
2.…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/section-c-fire-resistance
Part C1 Fire resistance and stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as
follows:
NSW C1.10 Fire hazard properties…
/editions/2019/ncc-2019-volume-one/new-south-wales/section-c-fire-resistance
Part C1 Fire resistance and stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as follows:
NSW C1.10 Fire hazard properties
(a)
The fire hazard properties of the following…
/editions/2016/ncc-2016-volume-one/tasmania/section-general-provisions
Tas A1.1 Definitions
Insert definition for centre-based care class 4 facilityas follows:
Centre-based care class 4 facility
is a facility as defined in Centre Based Care Class 4 Standards.
Insert definition for centre-based care class 5…
/editions/2016-a1/ncc-2016-volume-one/tasmania/section-general-provisions
Tas A1.1 Definitions
Insert definition for centre-based care class 4 facilityas follows:
Centre-based care class 4 facility
is a facility as defined in Centre Based Care Class 4 Standards.
Insert definition for centre-based care class 5…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-312-energy-efficiency/part-3121-building
3.12.1 Application
(a)
The provisions of 3.12.1.1 to
3.12.1.5 apply to—
(i)
a Class 1 building; and…
/editions/2019/ncc-2019-volume-two/part-312-energy-efficiency/part-3121-building-fabric
3.12.1 Application
(a)
The provisions of 3.12.1.1 to 3.12.1.5 apply to—
(i)
a Class 1 building; and
(ii)
a Class 10a building with a conditioned space.
(b)
The provisions of 3.12.1.6 apply to a Class 1 building with…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation-deemed
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F4.1
to F4.12; and
(ii)
for farm buildings and farm sheds, Part H3.
(b)…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F4.1
to F4.12; and
(ii)
for farm buildings and farm sheds, Part H3.
(b)…