Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark
Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • HP
  • Commercial providers
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • General User
      1. What you need to know
      2. History
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Specification E3.1 Lift Installations
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift installations
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e31
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift installations
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Report Cost implications of proposals to amend DTS Provisions
/resource/report/report-cost-implications-proposals-amend-dts-provisions

This report provides commentary on the cost implications of a range of proposed Deemed-to-Satisfy provisions emanating from the Emergency Egress for all Occupants Project. This report was prepared for the ABCB by Rider Levett Bucknall (RLB) in order to…

Report-cost-implications-proposals-amend-DtS-provisions.pdf (731.9 KB)
Part G6 Occupiable outdoor areas
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g6-occupiable-outdoor-areas
Note: Note: Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas. G6.1 Application of Part (a) The Deemed-to-Satisfy Provisions of this Part apply to…
Specification C1.13a Fire-protected timber
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c113a-fire
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded…
Part G6 Occupiable outdoor areas
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g6-occupiable
Note: Note: Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas. G6.1 Application of Part (a) The Deemed-to-Satisfy Provisions of this Part apply to…
Specification C1.13a Fire-protected timber
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c113a-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. 2. Requirements 2.1…
Part J8 Facilities for energy monitoring
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j8-facilities-energy-monitoring
J8.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with— (i) J0.1 to J0.5; and (ii) J1.1 to J1.6; and (iii) J3.1 to J3.7; and…
Part J8 Facilities for energy monitoring
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j8-facilities
J8.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with— (i) J0.1 to J0.5; and (ii) J1.1 to J1.6; and (iii) J3.1 to J3.7; and…
ABCB Business Plan 2023-24 - overview
/resource/plan/abcb-business-plan-2023-24-overview

On 9 June 2023, Building Ministers approved the ABCB Business Plan for 2023-24. Ministers agreed we should pursue key initiatives including the adequacy and equity of female sanitary facilities, commercial energy efficiency and improved provisions for…

ABCB_A3_Business_Plan_FA.pdf (105.02 KB)
Schedule 4 Referenced documents
/editions/2019/ncc-2019-volume-one/tasmania/schedule-4-referenced-documents
Tas Schedule 4 Referenced documents All legislation referenced in this Appendix is Tasmanian State legislation unless noted otherwise. All referenced documents including legislation, codes, Australian Standards, guidelines and codes of practice are…
Schedule 4 Referenced documents
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/schedule-4-referenced-documents
Tas Schedule 4 Referenced documents All legislation referenced in this Appendix is Tasmanian State legislation unless noted otherwise. All referenced documents including legislation, codes, Australian Standards, guidelines and codes of practice are…
December CEO Update - Gary Rake
/news/2024/december-ceo-update-gary-rake
It’s been a busy year for the Australian Building…We know our stakeholders are eager to hear how…Building Ministers asked us to work with industry…Taking on another important piece of work for…Common submission themesThis process should not be rushed. There was a…We delivered our last face to face forum for the…
December CEO Update - Adrian Piani
/news/2025/december-ceo-update-adrian-piani
As 2025 draws to a close, I'd like to reflect on…Treasury has released a discussion paper seeking…At its meeting on 10 November, the Board…Our team is preparing preview drafts for NCC 2025…The ABCB Office will be closed from 25 December…
Part E4 Visibility in an Emergency, Exit Signs and Warning Systems (Performance Requirements)
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
EP4.1 To facilitate safe evacuation in an emergency, a building must be provided with a system that— (a) ensures a level of visibility sufficient to enable exits, paths of travel to exits and any obstacles along a path of travel to an exit to…
Part E4 Visibility in an Emergency, Exit Signs and Warning Systems (Performance Requirements)
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
EP4.1 To facilitate safe evacuation in an emergency, a building must be provided with a system that— (a) ensures a level of visibility sufficient to enable exits, paths of travel to exits and any obstacles along a path of travel to an exit to…
Part G4 Construction in alpine areas (DtS)
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with— (i) G4.1 to G4.9; and (ii) for a…
Part G4 Construction in alpine areas (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied…
ACT 7.1 Energy Efficiency of Building Alterations
/editions/2016-a1/ncc-2016-volume-two/australian-capital-territory/act-71-energy-efficiency-building
Application Application: ACT Part 7.1 applies to work in relation to adding to or extending a completed building that can be lawfully occupied or used, where there is not otherwise a requirement to bring into BCA compliance the unaltered…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10

Areas of Interest

  • Access and egress (10)
  • Building services (9)
  • Fire safety (9)
  • Health and amenity (9)
  • Performance (9)
  • Structural safety (9)
  • Energy efficiency (7)
  • Plumbing and drainage (7)
  • Product certification (6)
  • Water services (5)

Content type

  • Show all (360)
  • NCC Page (284)
  • Article (39)
  • Resource (22)
  • Page (10)
  • PCD (2)
  • Video (2)
  • (-) FAQ (1)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube