/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?
Photoluminescence is the…
/resource/report/residential-energy-efficiency-heating-and-cooling-load-limits
Report This report outlines the principles and methodology used to develop the proposed residential heating and cooling load limits for all Nationwide House Energy Rating Scheme (NatHERS) climate zones. The views expressed in this report are those of…
Distortional buckling behaviour cold formed steel compression members elevated temperatures
/resource/report/distortional-buckling-behaviour-cold-formed-steel-compression-members-elevated-temperatures
This report investigates the distortional buckling behaviour of light gauge cold-formed steel compression members under simulated fire conditions. Submitted as part of the ABCB Scholarship Research Program. The views expressed in these reports are…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that Specification E4.8 provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that Specification E4.8 provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?…
PCD 2025 - Re-entry from fire-isolated exits
/pcd/pcd-2025-re-entry-fire-isolated-exits
These changes aim to improve safety and signage to minimise the risk that a person becomes trapped in a fire-isolated exit, resulting in safer fire-isolated exits from buildings.
/editions/2016-a1/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/editions/2016/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/resources/videos/applying-ncc-provision-a224-interactive-case-study
This case study of a residential apartment building is applied using the NCC provision A2.2(4). This four-step process demonstrates a sanitary drainage Performance Solution.
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/211-design-scenario-rc
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/211-design-scenario-rc
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/211-design-scenario
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/211
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/211
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/211
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/ncc-navigator/thermal-bridging-residential-buildings
This document explains the requirements for reducing thermal bridging in residential buildings focusing on metal-framed walls, roofs, ceilings and floors. It provides practical guidance on compliance options and methods to improve energy efficiency and…
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d1-provision-escape
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1
to D1.17, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)
in a…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d1-provision-escape
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1
to D1.17, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)
in a…
/editions/2016-a1/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and
VERIFICATION METHODS
V2.2.1 Weatherproofing
(a)
Compliance with for the weatherproofing of an external wall that—
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and-weatherproofing
VERIFICATION METHODS
V2.2.1 Weatherproofing
(a)
Compliance with for the weatherproofing of an external wall that—
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…