/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g5-dts
Deemed-to-Satisfy Provisions
G5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsGP5.1 is satisfied by complying with G5.1 and G5.2.
(b)
Where a Performance Solution is…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/queensland/qld-part-g5-construction-bushfire-prone
Delete GP5.1 and insert Qld GP5.1 as follows:
Qld GP5.1
A building that is constructed in a designated bushfire prone area must be designed and constructed to reduce the risk of ignition from a bushfire while the fire front passes.…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g5-construction-bushfire-dts
Deemed-to-Satisfy Provisions
G5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsGP5.1 is satisfied by complying with G5.1 and G5.2.
(b)
Where a Performance Solution is…
/editions/2019/ncc-2019-volume-one/queensland/qld-part-g5-construction-bushfire-prone-areas
Delete GP5.1 and insert Qld GP5.1 as follows:
Qld GP5.1
A building that is constructed in a designated bushfire prone area must be designed and constructed to reduce the risk of ignition from a bushfire while the fire front passes.…
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternate bushfire protection design is proposed as a Performance Solution to that described in Part 3.10.5, that proposal must comply with—…
/editions/2016-a1/ncc-2016-volume-one/section-b-structure/specification-b12-design-buildings
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
GP4.1
An external doorway from a building in an alpine area must be installed so that opening the door is not obstructed by snow or ice.
Application
Application
applies to a building constructed in an alpine area overrules other provisions of…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016-a1/ncc-2016-volume-one/queensland/qld-part-g5-construction-bushfire-prone-areas
Delete GP5.1 and insert Qld GP5.1 as follows:
Qld GP5.1
A building that is constructed in a designated bushfire prone area must be designed and constructed to reduce the risk of ignition from a bushfire while the fire front passes.…
/editions/2016-a1/ncc-2016-volume-one/south-australia/sa-part-g5-construction-bushfire-prone-areas
Delete G5.1 and insert SA G5.1:
SA G5.1 Application of Part
The Deemed-to-Satisfy Provisions of this Part apply to—
(a)
a Class 2 or 3 building; or
(b)
a Class 10a building or deck located within 6 m of an associated Class 2 or 3…
/editions/2016/ncc-2016-volume-one/section-b-structure/specification-b12-design-buildings-cyclonic
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
GP4.1
An external doorway from a building in an alpine area must be installed so that opening the door is not obstructed by snow or ice.
Application
Application
applies to a building constructed in an alpine area overrules other provisions of…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016/ncc-2016-volume-one/queensland/qld-part-g5-construction-bushfire-prone-areas
Delete GP5.1 and insert Qld GP5.1 as follows:
Qld GP5.1
A building that is constructed in a designated bushfire prone area must be designed and constructed to reduce the risk of ignition from a bushfire while the fire front passes.…
/editions/2016/ncc-2016-volume-one/south-australia/sa-part-g5-construction-bushfire-prone-areas
Delete G5.1 and insert SA G5.1:
SA G5.1 Application of Part
The Deemed-to-Satisfy Provisions of this Part apply to—
(a)
a Class 2 or 3 building; or
(b)
a Class 10a building or deck located within 6 m of an associated Class 2 or 3…
/editions/2019/ncc-2019-volume-one/section-b-structure/specification-b12-design-buildings-cyclonic
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g5-construction-bushfire
GP5.1
NSW GP5.1
Qld GP5.1
Tas GP5.1
A building that is constructed in a designated bushfire prone area must, to the degree necessary, be designed and constructed to reduce the risk of ignition from a bushfire, appropriate to the…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g5-construction-bushfire
GP5.1
NSW GP5.1
Qld GP5.1
Tas GP5.1
A building that is constructed in a designated bushfire prone area must, to the degree necessary, be designed and constructed to reduce the risk of ignition from a bushfire, appropriate to the…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g5-construction-bushfire
G5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsGP5.1 is satisfied by complying with G5.1 and G5.2.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g5-construction-bushfire
G5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsGP5.1 is satisfied by complying with G5.1 and G5.2.
(b)
Where a Performance Solution is proposed, the relevant Performance…