Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark
Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • HP
  • Commercial providers
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • General User
      1. What you need to know
      2. History
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Specification E3.1 Lift Installations
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift installations
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e31
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Specification E3.1 Lift installations
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e31-lift
1. Scope This Specification contains requirements for electric passenger lift installations and electrohydraulic passenger lift installations. 2. Lift cars exposed to solar radiation (a) A lift car exposed to solar radiation directly, or…
Thermal bridging in commercial buildings
/ncc-navigator/thermal-bridging-commercial-buildings

This NCC Navigator provides an introduction to thermal bridging and how the NCC addresses it for commercial buildings in NCC Volume One. It explains how to account for thermal bridges when calculating the Total R-Value of certain construction types.…

Specification J5.2e Energy Efficiency Ratios
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j52e-energy-efficiency
1. Scope (a) This Specification contains the requirements for the energy efficiency ratios of— (i) refrigerant chillers used as part of an air-conditioning system; and (ii) packaged air-conditioning equipment.…
Specification J5.2e Energy Efficiency Ratios
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j52e-energy
1. Scope (a) This Specification contains the requirements for the energy efficiency ratios of— (i) refrigerant chillers used as part of an air-conditioning system; and (ii) packaged air-conditioning equipment.…
Part 2.2 Damp and Weatherproofing (Verification Methods)
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and-weatherproofing
VERIFICATION METHODS V2.2.1 Weatherproofing (a) Compliance with for the weatherproofing of an external wall that— (i) has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
Part 2.2 Damp and Weatherproofing (Verification Methods)
/editions/2016-a1/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and
VERIFICATION METHODS V2.2.1 Weatherproofing (a) Compliance with for the weatherproofing of an external wall that— (i) has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
NCC 2022 Volume Two gutters, downpipes and overflow (GDO) calculator
/resource/calculator/ncc-2022-volume-two-gutters-downpipes-and-overflow-gdo-calculator

Assists in developing a better understanding of the NCC Volume Two ABCB Housing Provision Standard Gutters and Downpipes provisions.
To use the GDO Calculator enter information about the location, roof design and types of overflow measures. Based…

Calculator-GDO-NCC-2022.xlsx (542.88 KB)
Part H3 Farm buildings and farm sheds
/editions/2019/ncc-2019-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and-farm
Note: Note: Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E and F for farm buildings and farm sheds H3.1 Application of Part SA Part H3 (a) The Deemed-to-Satisfy Provisions…
Part H3 Farm buildings and farm sheds
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-h-special-use-buildings/part-h3-farm
Note: Note: Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E and F for farm buildings and farm sheds H3.1 Application of Part SA Part H3 (a) The Deemed-to-Satisfy Provisions…
Schedule of Products - Heated Water Products
/schedule-products-heated-water-products

Schedule of Products - Heated Water Products

Part 3.2.5 Footing and slab construction
/editions/2019/ncc-2019-volume-two/part-32-footings-and-slabs/part-325-footing-and-slab-construction
Explanatory information: Explanatory information: The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not covered by this Part then…
Part 3.2.5 Footing and slab construction
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-32-footings-and-slabs/part-325-footing-and
Explanatory information: Explanatory information: The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not…
Schedule of Products - Valves – General
/schedule-products-valves-general

Schedule of Products - Valves – General

Temporary structures
/resource/standard/temporary-structures

This Standard provides technical design criteria requirements for temporary structures, covering structural safety (particularly determining appropriate wind actions), fire safety (including fire resistance of materials; fire safety services and…

Standard-temporary-structures.pdf (2.63 MB)
Specification H1.3 Construction of Proscenium Walls
/editions/2016/ncc-2016-volume-one/section-h-special-use-buildings/specification-h13-construction
1. Scope This Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like. 2. Separation of stage areas, etc (a) Dressing rooms, scene docks, property rooms, workshops, associated…
Specification H1.3 Construction of Proscenium Walls
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/specification-h13-construction
1. Scope This Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like. 2. Separation of stage areas, etc (a) Dressing rooms, scene docks, property rooms, workshops, associated…
Schedule 5 Fire-resistance of building elements
/editions/2019/ncc-2019-volume-two/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope This Schedule sets out the procedures for determining the FRL of building elements. 2. Rating A building element meets the requirements of this Schedule if— (a) it is listed in, and complies with Table 1 of this Schedule; or…
Schedule 5 Fire-resistance of building elements
/editions/2019/ncc-2019-volume-three/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope This Schedule sets out the procedures for determining the FRL of building elements. 2. Rating A building element meets the requirements of this Schedule if— (a) it is listed in, and complies with Table 1 of this Schedule; or…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10

Areas of Interest

  • Performance (10)
  • Plumbing and drainage (10)
  • Energy efficiency (9)
  • Fire safety (8)
  • Building services (6)
  • Health and amenity (6)
  • Water services (5)
  • Product certification (4)
  • Structural safety (4)
  • NCC compliance (3)
  • Access and egress (2)
  • Governing Requirements (1)

Content type

  • NCC Page (652)
  • Article (48)
  • Page (44)
  • Resource (9)
  • PCD (8)
  • NCC Navigator Page (6)
  • Video (2)
  • Page (CPD) (1)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube