Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark

NCC 2022 online services are temporarily affected

We are working to fix some display issues with NCC 2022 online. You can still download each volume via the editions page. We apologise for any inconvenience. 

Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

2.9 Design scenario (UF)
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/29-design-scenario
Unexpected catastrophic failure Design scenario in brief The design will be suitably robust to prevent catastrophic structural failure in a fire. Required outcome Demonstrate that disproportionate failure does not occur for the duration…
Part 2.4 Health and Amenity (Verification Methods)
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-24-health-and-amenity
VERIFICATION METHODS V2.4.5 Verification of suitable indoor air quality For a Class 1 building, compliance with P2.4.5(a) and P2.4.5(b)(i) is verified when it is determined that the building under typical conditions in use is provided with…
2.9 Design scenario (UF)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/29
Unexpected catastrophic failure Design scenario in brief The design will be suitably robust to prevent catastrophic structural failure in a fire. Required outcome Demonstrate that disproportionate failure does not occur for the duration of the…
2.9 Design scenario (UF)
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/29
Unexpected catastrophic failure Design scenario in brief The design will be suitably robust to prevent catastrophic structural failure in a fire. Required outcome Demonstrate that disproportionate failure does not occur for the duration…
2.9 Design scenario (UF)
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/29
Unexpected catastrophic failure Design scenario in brief The design will be suitably robust to prevent catastrophic structural failure in a fire. Required outcome Demonstrate that disproportionate failure does not occur for the duration…
Part 1.1 Interpretation
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-11-interpretation
1.1.1 Definitions 1.1.1.1 * * * * * Note This clause has deliberately been left blank. 1.1.1.2 In the Housing Provisions, unless the contrary appears: Alpine area means land— likely to be subject to significant…
Part 1.1 Interpretation
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-11-interpretation
1.1.1 Definitions 1.1.1.1 * * * * * Note This clause has deliberately been left blank. 1.1.1.2 In the Housing Provisions, unless the contrary appears: Alpine area means land— likely to be subject to significant…
Part A1 Interpretation
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/part-a1-interpretation
A1.1 Definitions Note: States and Territories may vary or add to the definitions contained in at the relevant State or Territory Appendix. In Volume One of the BCA unless the contrary intention appears— Accessible means having features to…
Part A1 Interpretation
/editions/2016/ncc-2016-volume-one/section-general-requirements/part-a1-interpretation
A1.1 Definitions Note: States and Territories may vary or add to the definitions contained in at the relevant State or Territory Appendix. In Volume One of the BCA unless the contrary intention appears— Accessible means having features to…
Part D3 Access for People with a Disability
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d3-access-people-disability
D3.0 Deemed-to-Satisfy Provisions Tas D3.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with— (i) D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and…
Part D3 Access for People with a Disability
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d3-access-people-disability
D3.0 Deemed-to-Satisfy Provisions Tas D3.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with— (i) D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and…
Specification E2.2c Smoke-and-Heat Vents
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e22c-smoke-and
1. Adoption of AS 2665 Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that— (a) * * * * * (b) * * * * * (c) permanently open vents may form part of the smoke/heat venting system provided they…
Specification E2.2c Smoke-and-Heat Vents
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e22c-smoke-and
1. Adoption of AS 2665 Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that— (a) * * * * * (b) * * * * * (c) permanently open vents may form part of the smoke/heat venting system provided they…
Specification E2.2c Smoke-and-heat vents
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e22c
1. Adoption of AS 2665 Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that— (a) * * * * * (b) * * * * * (c) permanently open vents may form part of the smoke/heat venting system…
Specification E2.2c Smoke-and-heat vents
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e22c-smoke-and
1. Adoption of AS 2665 Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that— (a) * * * * * (b) * * * * * (c) permanently open vents may form part of the smoke/heat venting system…
Part E1 Fire Fighting Equipment (Deemed-to-Satisfy Provisions)
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting
E1.0 Deemed-to-Satisfy Provisions Tas E1.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with— (i) E1.1 to E1.10; and (ii) in a building containing an atrium, Part G3;…
Part E1 Fire Fighting Equipment (Deemed-to-Satisfy Provisions)
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
E1.0 Deemed-to-Satisfy Provisions Tas E1.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with— (i) E1.1 to E1.10; and (ii) in a building containing an atrium, Part G3;…
Part G3 Atrium Construction
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g3-atrium-construction
Note Note: Part G3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Atrium Construction. G3.1 Application of Part This Part does not apply to an atrium which— (a) connects only 2…
Part H1 Class 9b Buildings
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/part-h1-class-9b-buildings
Note Note. Part H1 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Class 9b buildings. H1.1 Application of Part NSW H1.1 (a) The Deemed-to-Satisfy Provisions of this Part apply…
Part G3 Atrium Construction
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g3-atrium-construction
Note Note: Part G3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Atrium Construction. G3.1 Application of Part This Part does not apply to an atrium which— (a) connects only 2…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10

Areas of Interest

  • Energy efficiency (10)
  • Performance (5)
  • Health and amenity (3)
  • Access and egress (2)
  • Building services (2)
  • Fire safety (1)
  • NCC compliance (1)
  • Plumbing and drainage (1)
  • Product certification (1)
  • Structural safety (1)
  • Water services (1)

Content type

  • NCC Page (315)
  • Article (14)
  • Page (7)
  • Resource (7)
  • NCC Navigator Page (3)
  • PCD (2)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube