/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/29-design-scenario
Unexpected catastrophic failure
Design scenario in brief
The design will be suitably robust to prevent catastrophic structural failure in a fire.
Required outcome
Demonstrate that disproportionate failure does not occur for the duration…
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-24-health-and-amenity
VERIFICATION METHODS
V2.4.5 Verification of suitable indoor air quality
For a Class 1 building, compliance with P2.4.5(a) and P2.4.5(b)(i) is verified when it is determined that the building under typical conditions in use is provided with…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/29
Unexpected catastrophic failure
Design scenario in brief
The design will be suitably robust to prevent catastrophic structural failure in a fire.
Required outcome
Demonstrate that disproportionate failure does not occur for the duration of the…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/29
Unexpected catastrophic failure
Design scenario in brief
The design will be suitably robust to prevent catastrophic structural failure in a fire.
Required outcome
Demonstrate that disproportionate failure does not occur for the duration…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/29
Unexpected catastrophic failure
Design scenario in brief
The design will be suitably robust to prevent catastrophic structural failure in a fire.
Required outcome
Demonstrate that disproportionate failure does not occur for the duration…
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-11-interpretation
1.1.1 Definitions
1.1.1.1
* * * * *
Note
This clause has deliberately been left blank.
1.1.1.2
In the Housing Provisions, unless the contrary appears:
Alpine area
means land—
likely to be subject to significant…
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-11-interpretation
1.1.1 Definitions
1.1.1.1
* * * * *
Note
This clause has deliberately been left blank.
1.1.1.2
In the Housing Provisions, unless the contrary appears:
Alpine area
means land—
likely to be subject to significant…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/part-a1-interpretation
A1.1 Definitions
Note: States and Territories may vary or add to the definitions contained in at the relevant State or Territory Appendix.
In Volume One of the BCA unless the contrary intention appears—
Accessible
means having features to…
/editions/2016/ncc-2016-volume-one/section-general-requirements/part-a1-interpretation
A1.1 Definitions
Note: States and Territories may vary or add to the definitions contained in at the relevant State or Territory Appendix.
In Volume One of the BCA unless the contrary intention appears—
Accessible
means having features to…
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d3-access-people-disability
D3.0 Deemed-to-Satisfy Provisions
Tas D3.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d3-access-people-disability
D3.0 Deemed-to-Satisfy Provisions
Tas D3.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e22c-smoke-and
1. Adoption of AS 2665
Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that—
(a)
* * * * *
(b)
* * * * *
(c)
permanently open vents may form part of the smoke/heat venting system provided they…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e22c-smoke-and
1. Adoption of AS 2665
Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that—
(a)
* * * * *
(b)
* * * * *
(c)
permanently open vents may form part of the smoke/heat venting system provided they…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e22c
1. Adoption of AS 2665
Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that—
(a)
* * * * *
(b)
* * * * *
(c)
permanently open vents may form part of the smoke/heat venting system…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e22c-smoke-and
1. Adoption of AS 2665
Automaticsmoke-and-heat vents must be installed as a system complying with AS 2665 except that—
(a)
* * * * *
(b)
* * * * *
(c)
permanently open vents may form part of the smoke/heat venting system…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E1.1
to E1.10; and
(ii)
in a building containing an atrium, Part G3;…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E1.1
to E1.10; and
(ii)
in a building containing an atrium, Part G3;…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g3-atrium-construction
Note
Note:
Part G3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Atrium Construction.
G3.1 Application of Part
This Part does not apply to an atrium which—
(a)
connects only 2…
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/part-h1-class-9b-buildings
Note
Note.
Part H1 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Class 9b buildings.
H1.1 Application of Part
NSW H1.1
(a)
The Deemed-to-Satisfy Provisions of this Part apply…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g3-atrium-construction
Note
Note:
Part G3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D and E for Atrium Construction.
G3.1 Application of Part
This Part does not apply to an atrium which—
(a)
connects only 2…