/editions/2019-a1/ncc-2019-volume-two-amendment-1/section-1-governing-requirements/part-a6-building
Introduction to this Part
The NCC groups buildings and structures by the purpose for which they are designed, constructed or adapted to be used, rather than by the function or use they are put to, assigning each type of building or structure with a…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-governing-requirements/part-a6-building
Introduction to this Part
The NCC groups buildings and structures by the purpose for which they are designed, constructed or adapted to be used, rather than by the function or use they are put to, assigning each type of building or structure with a…
/editions/2019/ncc-2019-volume-one/section-governing-requirements/part-a6-building-classification
Introduction to this Part
The NCC groups buildings and structures by the purpose for which they are designed, constructed or adapted to be used, rather than by the function or use they are put to, assigning each type of building or structure with a…
/editions/2016/ncc-2016-volume-two/part-37-fire-safety/part-371-fire-separation
Appropriate Performance Requirements
Appropriate
Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.1, that proposal must comply with—
P2.3.1
; and
the relevant Performance…
/editions/2016-a1/ncc-2016-volume-two/part-37-fire-safety/part-371-fire-separation
Appropriate Performance Requirements
Appropriate
Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.1, that proposal must comply with—
P2.3.1
; and
the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d1-provision-escape
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1
to D1.17, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)
in a…
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d1-provision-escape
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1
to D1.17, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)
in a…
/editions/2016-a1/ncc-2016-volume-two/part-39-safe-movement-and-access/part-392-barriers-and
Appropriate Performance Requirements
Appropriate :
Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with—
Performance RequirementP2.1.1; and
Performance…
/editions/2016/ncc-2016-volume-two/part-39-safe-movement-and-access/part-392-barriers-and-handrails
Appropriate Performance Requirements
Appropriate :
Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with—
Performance RequirementP2.1.1; and
Performance…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/specification-g38-fire-and-smoke
1. Scope
This Specification sets out the requirements for the design and operation of systems of fire and smoke control in buildings containing an atrium.
Intent
To clarify that includes the requirements for fire and smoke control systems in…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/specification-g38-fire-and
1. Scope
This Specification sets out the requirements for the design and operation of systems of fire and smoke control in buildings containing an atrium.
Intent
To clarify that includes the requirements for fire and smoke control systems in…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/specification-g38-fire-and-smoke
1. Scope
This Specification sets out the requirements for the design and operation of systems of fire and smoke control in buildings containing an atrium.
Intent
To clarify that Specification G3.8 includes the requirements for fire and smoke control…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/specification-g38
1. Scope
This Specification sets out the requirements for the design and operation of systems of fire and smoke control in
buildings containing an atrium.
Intent
To clarify that…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided…
/editions/2019/ncc-2019-volume-one/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided from the following:
(iii)
a storage shed in a…
/editions/2019/ncc-2019-volume-two/part-35-roof-and-wall-cladding/part-353-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-35-roof-and-wall-cladding/part-353-gutters
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative gutter and…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h108-pharmacies
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h108-pharmacies
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-d-access-and-egress/part-d1-provision
Deemed-to-Satisfy Provisions
D1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.17, D2.1 to D2.25 and D3.1…