/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/14-design-scenarios
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements set out in Table 1.1.
The design…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/14-design-scenarios
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method
presents specific design
scenarios that must be considered in order to demonstrate that the fire safety aspects of a building
design…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/14
1.4 Design scenarios: NCC Performance Requirements
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g1-minor-structures-and-dts
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provisio n for this Performance Requirement.
Tas G1.0(b)
(b)
Where a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g1-minor-dts
G1.0 Deemed-to-Satisfy Provisions
(a)
Performance RequirementGP1.1 must be complied with.
Explanatory information
There is no Deemed-to-Satisfy Provisio n for this Performance Requirement.
Tas G1.0(b)
(b)
Where a…
/editions/2016/ncc-2016-volume-one/tasmania/section-h-special-use-buildings-h113-h124
Tas Part H113 Foundries
Tas H113.1 Application of Part
This Part is applicable to every building or premises in which foundry operations are undertaken.
Foundries must provide for the comfort and safety of workers on the premises.
Tas H113.2…
/editions/2016-a1/ncc-2016-volume-one/tasmania/section-h-special-use-buildings-h113-h124
Tas Part H113 Foundries
Tas H113.1 Application of Part
This Part is applicable to every building or premises in which foundry operations are undertaken.
Foundries must provide for the comfort and safety of workers on the premises.
Tas H113.2…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e18-fire-control
1. Scope
This Specification describes the construction and content of required fire control centres and rooms. A fire control room is a fire control centre in a dedicated room with additional specific requirements. Clauses 2 to 5 apply to fire…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e18-fire
1. Scope
This Specification describes the construction and content of required fire control centres and rooms. A fire control room is a fire control centre in a dedicated room with additional specific requirements. Clauses 2 to 5 apply to fire…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e18
1. Scope
This Specification describes the construction and content of required fire control centres and rooms. A fire control room is a fire control centre in a dedicated room with additional specific requirements. Clauses 2 to 5 apply to fire…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e18-fire-control
1. Scope
This Specification describes the construction and content of required fire control centres and rooms. A fire control room is a fire control centre in a dedicated room with additional specific requirements. Clauses 2 to 5 apply to fire…
/editions/2016/ncc-2016-volume-two/part-37-fire-safety/part-371-fire-separation
Appropriate Performance Requirements
Appropriate
Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.1, that proposal must comply with—
P2.3.1
; and
the relevant Performance…
/editions/2016-a1/ncc-2016-volume-two/part-37-fire-safety/part-371-fire-separation
Appropriate Performance Requirements
Appropriate
Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.1, that proposal must comply with—
P2.3.1
; and
the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a13-documents-adopted
1. Schedule of referenced documents
ACT, NSW, NT, QLD, SA, Tas, Vic Spec A1.3 Table 1
The Standards and other documents listed in Table 1 are referred to in Volume One of the BCA.
Table 1: SCHEDULE OF REFERENCED DOCUMENTS
No.
Date…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a13-documents
1. Schedule of referenced documents
ACT, NSW, NT, QLD, SA, Tas, Vic Spec A1.3 Table 1
The Standards and other documents listed in Table 1 are referred to in Volume One of the BCA.
Table 1: SCHEDULE OF REFERENCED DOCUMENTS
No.
Date…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/part-c1-fire-resistance-and-stability
C1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1
to C1.13, C2.1 to C2.14 and C3.1toC3.17; and
(ii)
in a building containing an…
/pcd/pcd-2025-commercial-building-energy-efficiency
These changes aim to reduce emissions, providing cost-effective fuel and technology neutral ways for buildings to move to a net zero future.
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c1-fire-resistance-and
C1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1
to C1.14, C2.1 to C2.14 and C3.1toC3.17; and
(ii)
in a building containing an…