/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j12-material
1. Scope
This Specification lists the thermal properties of some common construction materials.
Intent
To clarify that covers the relevant properties attributed to common construction materials, air films and airspaces, and reflective…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j12-material-properties
1. Scope
This Specification lists the thermal properties of some common construction materials.
Intent
To clarify that covers the relevant properties attributed to common construction materials, air films and airspaces, and reflective…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-j12
1. Scope
This Specification lists the thermal properties of some common construction materials.
Intent
To clarify that Specification J1.2 covers the relevant properties attributed to common construction materials, air films and airspaces, and…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/part-c1-fire-resistance-and-stability
C1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1
to C1.13, C2.1 to C2.14 and C3.1toC3.17; and
(ii)
in a building containing an…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-j16-sub-floor-thermal
1. Scope
This Specification describes the thermal performance of sub-floor spaces and soil in direct contact with a floor for the purposes of calculating the Total R-Value of a floor.
Intent
To provide the R-Values considered to be achieved by sub-…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-j16-sub
1. Scope
This Specification describes the thermal performance of sub-floor spaces and soil in direct contact with a floor for the purposes of calculating the Total R-Value of a floor.
Intent
To provide the R-…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-35-roof-and-wall-cladding/part-353-gutters
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative gutter and…
/editions/2019/ncc-2019-volume-two/part-35-roof-and-wall-cladding/part-353-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—…
/editions/2019/ncc-2019-volume-three/history-pca-adoption/history-adoption
1.0 Adoption of PCA 2011
The 2011 edition of the PCA was adopted by the Commonwealth, States and Territories as set out in Table 1.0.
Table 1.0 History of adoption of PCA 2011
Administration
Adoption Date
Australian Government
1…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h108-pharmacies
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h108-pharmacies
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/history-pca-adoption/history-adoption
1.0 Adoption of PCA 2011
The 2011 edition of the PCA was adopted by the Commonwealth, States and Territories as set out in Table 1.0.
Table 1.0 History of adoption of PCA 2011…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c1-fire-resistance-and
C1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1
to C1.14, C2.1 to C2.14 and C3.1toC3.17; and
(ii)
in a building containing an…
/editions/2019/ncc-2019-volume-two/part-312-energy-efficiency/part-3121-building-fabric
3.12.1 Application
(a)
The provisions of 3.12.1.1 to 3.12.1.5 apply to—
(i)
a Class 1 building; and
(ii)
a Class 10a building with a conditioned space.
(b)
The provisions of 3.12.1.6 apply to a Class 1 building with…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-312-energy-efficiency/part-3121-building
3.12.1 Application
(a)
The provisions of 3.12.1.1 to
3.12.1.5 apply to—
(i)
a Class 1 building; and…
/resource/advisory-note/fire-performance-external-walls-and-cladding
At its meeting on 19 February 2016, the Building Ministers’ Forum agreed to the development and implementation of a range of measures to help address risks associated with high risk cladding products on high rise buildings. This included a National…
WaterMark Home
/watermark-home
The WaterMark Certification Scheme is a mandatory scheme for plumbing and drainage products of a certain type. Certification ensures products are fit for purpose and appropriately authorised for use in plumbing and drainage installations.
Schedule of Products - Valves – General
/schedule-products-valves-general
Schedule of Products - Valves – General
Schedule of Products - Fittings – Metallic
/schedule-products-fittings-metallic
Schedule of Products - Fittings – Metallic
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c1-fire-resistance
Deemed-to-Satisfy Provisions
C1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17;…