Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark

NCC 2022 online services are temporarily affected

We are working to fix some display issues with NCC 2022 online. You can still download each volume via the editions page. We apologise for any inconvenience. 

Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

2.4 Design scenario (SF)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/24
Smouldering fire Design scenario in brief A fire is smouldering in close proximity to a sleeping area. Required outcome Provide a safe sleeping area. Demonstrate that the level of safety be at least equivalent to the Deemed-to-Satisfy…
2.4 Design scenario (SF)
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/24-design-scenario-sf
Smouldering fire Design scenario in brief A fire is smouldering in close proximity to a sleeping area. Required outcome Provide a safe sleeping area. Demonstrate that the level of safety be at least equivalent to the Deemed-to-Satisfy…
2.4 Design scenario (SF)
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/24-design-scenario-sf
Smouldering fire Design scenario in brief A fire is smouldering in close proximity to a sleeping area. Required outcome Provide a safe sleeping area. Demonstrate that the level of safety be at least equivalent to the Deemed-to-Satisfy…
2.4 Design scenario (SF)
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/24-design-scenario
Smouldering fire Design scenario in brief A fire is smouldering in close proximity to a sleeping area. Required outcome Provide a safe sleeping area. Demonstrate that the level of safety be at least equivalent to the Deemed-to-Satisfy…
NSW Part H101 Entertainment venues other than temporary structures and drive-in theatres
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/nsw-part-h101-entertainment-venues
Note Note NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment…
Part 3.5.1 Sheet roofing
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-35-roof-and-wall-cladding/part-351-sheet
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative roof cladding is proposed as a…
Part 3.5.1 Sheet roofing
/editions/2019/ncc-2019-volume-two/part-35-roof-and-wall-cladding/part-351-sheet-roofing
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative roof cladding is proposed as a Performance Solution to that described in Part 3.5.1, that proposal must comply with— Performance…
Section B Water services
/editions/2019-a1/ncc-2019-volume-three-amendment-1/northern-territory/section-b-water-services
Part B2 Heated water services Performance Requirements Delete BP2.6(3) and insert NT BP2.6(3) as follows: NT BP2.6 Energy use and source (3) * * * * * Verification Methods Delete BV2.1 and insert NT BV2.1 as follows: NT…
Section B Water services
/editions/2019/ncc-2019-volume-three/northern-territory/section-b-water-services
Part B2 Heated water services Performance Requirements Delete BP2.6(3) and insert NT BP2.6(3) as follows: NT BP2.6 Energy use and source (3) * * * * * Verification Methods Delete BV2.1 and insert NT BV2.1 as follows: NT…
Section H Special Use Buildings
/editions/2016/ncc-2016-volume-one/victoria/section-h-special-use-buildings
Add Vic Part H101 as follows: Vic Part H101 Class 3, 9a and Class 9c Residential Aged Care Buildings Application Application: This Part only applies to Class 3, Class 9a and Class 9c residential aged care buildings. Note Note. Vic Part…
Section H Special Use Buildings
/editions/2016-a1/ncc-2016-volume-one/victoria/section-h-special-use-buildings
Add Vic Part H101 as follows: Vic Part H101 Class 3, 9a and Class 9c Residential Aged Care Buildings Application Application: This Part only applies to Class 3, Class 9a and Class 9c residential aged care buildings. Note Note. Vic Part…
Section H Special use buildings
/editions/2019-a1/ncc-2019-volume-one-amendment-1/victoria/section-h-special-use-buildings
Add Vic Part H101 as follows: Vic Part H101 Class 3 and Class 9a residential aged care buildings and Class 9c buildings Application: Application: This Part only applies to Class 3 and Class 9a residential aged care buildings and Class 9c…
Section H Special use buildings
/editions/2019/ncc-2019-volume-one/victoria/section-h-special-use-buildings
Add Vic Part H101 as follows: Vic Part H101 Class 3 and Class 9a residential aged care buildings and Class 9c buildings Application: Application: This Part only applies to Class 3 and Class 9a residential aged care buildings and Class 9c…
2.2 Design scenario (UT)
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/22
Fire in normally unoccupied room threatening occupants ofother rooms Design scenario in brief A fire starts in a normally unoccupied room and can potentially endanger a large number of occupants in another room. Required outcome…
2.2 Design scenario (UT)
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/22
Fire in normally unoccupied room threatening occupants of other rooms Design scenario in brief A fire starts in a normally unoccupied room and can potentially endanger a large number of occupants in another room. Required outcome…
2.2 Design scenario (UT)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/22
Fire in normally unoccupied room threatening occupants of other rooms Design scenario in brief A fire starts in a normally unoccupied room and can potentially endanger a large number of occupants in another room. Required outcome Demonstrate…
2.2 Design scenario (UT)
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/22-design-scenario-ut
Fire in normally unoccupied room threatening occupants of other rooms Design scenario in brief A fire starts in a normally unoccupied room and can potentially endanger a large number of occupants in another room. Required outcome Demonstrate…
2.2 Design scenario (UT)
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/22-design-scenario-ut
Fire in normally unoccupied room threatening occupants ofother rooms Design scenario in brief A fire starts in a normally unoccupied room and can potentially endanger a large number of occupants in another room. Required outcome…
2.2 Design scenario (UT)
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/22-design-scenario
Fire in normally unoccupied room threatening occupants of other rooms Design scenario in brief A fire starts in a normally unoccupied room and can potentially endanger a large number of occupants in another room. Required outcome…
ABCB data resources
/abcb-data-resources

As part of our work to support practitioners in understanding and using the code, the ABCB has published some datasets to data.gov.au the central source of Australian open government data.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • …
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Plumbing and drainage (3)
  • Water services (2)
  • Governing Requirements (1)
  • Product certification (1)

Content type

  • NCC Page (162)
  • Page (13)
  • Article (11)
  • NCC Navigator Page (1)
  • Resource (1)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube