Schedule of Products - Devices and Controllers
/schedule-products-devices-and-controllers
Schedule of Products - Devices and Controllers
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j15-wall
1. Scope
This Specification describes the thermal performance of some common forms of external wall construction.
Intent
To clarify that outlines the thermal performance of some of the more common forms of wall construction.
2.…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j15-wall-construction
1. Scope
This Specification describes the thermal performance of some common forms of external wall construction.
Intent
To clarify that outlines the thermal performance of some of the more common forms of wall construction.
2.…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019/ncc-2019-volume-one/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019/ncc-2019-volume-two/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019/ncc-2019-volume-three/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
PERFORMANCE REQUIREMENTS
FP1.1
, resulting from a storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or sitework, must be disposed of in a way that avoids the likelihood of damage or…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
PERFORMANCE REQUIREMENTS
FP1.1
, resulting from a storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or sitework, must be disposed of in a way that avoids the likelihood of damage or…
/news/2022/2022-ncc-seminars-save-date
Lead in plumbing products - Final Decision RIS
/lead-plumbing-products-final-decision-ris
This final decision RIS has been released, after public consultation, about the permissible lead content in plumbing products in contact with drinking water.
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided…
/editions/2019/ncc-2019-volume-one/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided from the following:
(iii)
a storage shed in a…
/resources/videos/section-j-transformed-stepping-energy-change-commercial-buildings
In May 2019, the ABCB co-hosted with Property Council of Australia a presentation titled: ‘Section J Transformed: Stepping into energy change for commercial buildings’. The presentation focuses on changes to Section J Energy efficiency, in NCC 2019…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a23-fire-resistance
1. Scope
This Specification sets out the procedures for determining the FRL of building elements.
Deemed-to-Satisfy Provisions often require building elements to have an FRL. explains how these FRLs are to be determined and, in conjunction with…
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a23-fire-resistance
1. Scope
This Specification sets out the procedures for determining the FRL of building elements.
Deemed-to-Satisfy Provisions often require building elements to have an FRL. explains how these FRLs are to be determined and, in conjunction with…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f2-sanitary-and-other
F2.0 Deemed-to-Satisfy Provisions
Vic F2.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F2.1
to F2.8; and
(ii)
for public transport buildings, Part H2; and…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f2-sanitary-and-other
F2.0 Deemed-to-Satisfy Provisions
Vic F2.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F2.1
to F2.8; and
(ii)
for public transport buildings, Part H2; and…