The Board
/about/board
The Australian Building Codes Board is a standards writing body responsible for the National Construction Code, the WaterMark Certification Scheme and the CodeMark Certification Scheme.
/editions/2019/ncc-2019-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and-farm
Note:
Note:
Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E and F for farm buildings and farm sheds
H3.1 Application of Part
SA Part H3
(a)
The Deemed-to-Satisfy Provisions…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-h-special-use-buildings/part-h3-farm
Note:
Note:
Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E and F for farm buildings and farm sheds
H3.1 Application of Part
SA Part H3
(a)
The Deemed-to-Satisfy Provisions…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation-dts
Deemed-to-Satisfy Provisions
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP4.1 to FP4.5 are satisfied by complying with—
(i)
F4.1 to F4.12; and
(ii)
for a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f4-light-and-dts
Deemed-to-Satisfy Provisions
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP4.1 to FP4.5 are satisfied by complying with—
(i)
F4.1 to F4.12; and
(ii)
for a…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
Requirements GP4.1 to
GP4.4 are satisfied…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-j15a-calculation-u
1. Scope
This specification describes the methods of calculating the U-Value and solar admittance of a wall-glazing construction.
Intent
This Specification describes the two calculation methods for determining if wall-glazing construction complies…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-j15a
1. Scope
This specification describes the methods of calculating the U-Value and solar admittance of a wall-glazing construction.
Intent
This Specification describes the two calculation…
/editions/2016-a1/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/editions/2016/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/news/2020/ncc-2022-new-sptc-referencing-system
Here’s what to expect with the code’s new referencing system, dubbed SPTC: ‘Section - Part - Type - Clause’.
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
E4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E4.1
to E4.9; and
(ii)
in a building containing an atrium, Part G3; and
(iii…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
E4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E4.1
to E4.9; and
(ii)
in a building containing an atrium, Part G3; and
(iii…
/editions/2016-a1/ncc-2016-volume-two/part-34-framing/part-344-structural-steel-members
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative structural steel member system is proposed as a Performance Solution to that described in Part 3.4.4, that proposal must comply with—
P2.1.1;…
/editions/2016/ncc-2016-volume-two/part-34-framing/part-344-structural-steel-members
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative structural steel member system is proposed as a Performance Solution to that described in Part 3.4.4, that proposal must comply with—
P2.1.1;…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j15-wall
1. Scope
This Specification describes the thermal performance of some common forms of external wall construction.
Intent
To clarify that outlines the thermal performance of some of the more common forms of wall construction.
2.…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j15-wall-construction
1. Scope
This Specification describes the thermal performance of some common forms of external wall construction.
Intent
To clarify that outlines the thermal performance of some of the more common forms of wall construction.
2.…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvb-modelling
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jvb
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…