/editions/2019/ncc-2019-volume-one/south-australia/section-c-fire-resistance
Part C1 Fire Resistance and Stability
After C1.1(a)(iii) add SAC1.1(a)(iv) and (v) and after C1.1(b) add SAC1.1(c) and (d) as follows:
SA C1.1 Type of construction required
(a)
The minimum Type of fire-resisting construction of a building…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-c-fire-resistance
Part C1 Fire Resistance and Stability
After C1.1(a)(iii) add SAC1.1(a)(iv) and (v) and after C1.1(b) add SAC1.1(c) and (d) as follows:
SA C1.1 Type of construction required
(a)
The…
/editions/2016/ncc-2016-volume-one/new-south-wales/section-c-fire-resistance
Part C1 Fire Resistance and Stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as follows:
NSW C1.10 Fire hazard properties
(a)
The fire hazard properties of the following…
/editions/2016-a1/ncc-2016-volume-one/new-south-wales/section-c-fire-resistance
Part C1 Fire Resistance and Stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as follows:
NSW C1.10 Fire hazard properties
(a)
The fire hazard properties of the following…
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2016/ncc-2016-volume-one/south-australia/sa-part-g5-construction-bushfire-prone-areas
Delete G5.1 and insert SA G5.1:
SA G5.1 Application of Part
The Deemed-to-Satisfy Provisions of this Part apply to—
(a)
a Class 2 or 3 building; or
(b)
a Class 10a building or deck located within 6 m of an associated Class 2 or 3…
/editions/2016-a1/ncc-2016-volume-one/south-australia/sa-part-g5-construction-bushfire-prone-areas
Delete G5.1 and insert SA G5.1:
SA G5.1 Application of Part
The Deemed-to-Satisfy Provisions of this Part apply to—
(a)
a Class 2 or 3 building; or
(b)
a Class 10a building or deck located within 6 m of an associated Class 2 or 3…
/editions/2019/ncc-2019-volume-one/new-south-wales/section-c-fire-resistance
Part C1 Fire resistance and stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as follows:
NSW C1.10 Fire hazard properties
(a)
The fire hazard properties of the following…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/section-c-fire-resistance
Part C1 Fire resistance and stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as
follows:
NSW C1.10 Fire hazard properties…
/editions/2019/ncc-2019-volume-two/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
Energy Efficiency NCC Volume Two
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
Energy Efficiency NCC Volume Two
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1…
/editions/2016-a1/ncc-2016-volume-two/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1.
(b)
Air movement required by (a) may be…
/editions/2016/ncc-2016-volume-two/part-312-energy-efficiency/part-3124-air-movement
3.12.4 Application
This Part applies to a habitable room in a Class 1 building.
3.12.4.1 Air movement
(a)
Air movement must be provided to habitable rooms in accordance with Table 3.12.4.1.
(b)
Air movement required by (a) may be…
/editions/2016/ncc-2016-volume-one/south-australia/section-c-fire-resistance
Part C1 Fire Resistance and Stability
After C1.1(a)(iv) add SA C1.1(a)(v), and after C1.1(b) add SA C1.1(c) and (d) as follows:
SA C1.1 Type of construction required
(a)
The minimum Type of fire-resisting construction of a building must be…
/editions/2016-a1/ncc-2016-volume-one/south-australia/section-c-fire-resistance
Part C1 Fire Resistance and Stability
After C1.1(a)(iii) add SA C1.1(a)(iv), and after C1.1(b) add SA C1.1(c) and (d) as follows:
SA C1.1 Type of construction required
(a)
The minimum Type of fire-resisting construction of a building must be…
/editions/2016/ncc-2016-volume-two/part-37-fire-safety/part-374-bushfire-areas
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative bushfire protection design is proposed as a Performance Solution to that described in Part 3.7.4, that proposal must comply with—
P2.3.4; and…
/editions/2016-a1/ncc-2016-volume-two/part-37-fire-safety/part-374-bushfire-areas
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative bushfire protection design is proposed as a Performance Solution to that described in Part 3.7.4, that proposal must comply with—
P2.3.4; and…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.13, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…