/editions/2019/ncc-2019-volume-one/tasmania/schedule-4-referenced-documents
Tas Schedule 4 Referenced documents
All legislation referenced in this Appendix is Tasmanian State legislation unless noted otherwise.
All referenced documents including legislation, codes, Australian Standards, guidelines and codes of practice are…
The Board
/about/board
The Australian Building Codes Board is a standards writing body responsible for the National Construction Code, the WaterMark Certification Scheme and the CodeMark Certification Scheme.
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jva
ACT Appendix
1. Scope
This Specification contains requirements that must be complied with in addition to the modelling requirements of JV1, JV2 and JV3.
Intent
To clarify that there are additional requirements to the modelling…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jva-additional
ACT Appendix
1. Scope
This Specification contains requirements that must be complied with in addition to the modelling requirements of JV1, JV2 and JV3.
Intent
To clarify that there are additional requirements to the modelling…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/27
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/27-design-scenario
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/27-design-scenario
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/27-design-scenario
Rapid fire spread involving internal surface linings
Design scenario in brief
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/27
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/27
Rapid fire spread involving internal surface linings
Design scenario in brief
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f6-condensation
Performance Requirements
FP6.1 Condensation and water vapour management
In a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, risks associated with water vapour and condensation must be managed to minimise their impact on…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h117-premises-lead-processing
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f6-condensation-management
Performance Requirements
FP6.1 Condensation and water vapour management
In a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, risks associated with water vapour and condensation must be managed to minimise their impact on…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h117-premises-lead-processing
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h108-pharmacies
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h108-pharmacies
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2016-a1/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/editions/2016/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…