/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-b-structure/part-b1-structural-provisions
Performance Requirements
BP1.1 Structural Reliability
(a)
A building or structure, during construction and use, with appropriate degrees of reliability, must—
(i)
perform adequately under all reasonably expected design actions; and…
/editions/2019/ncc-2019-volume-one/section-b-structure/part-b1-structural-provisions
Performance Requirements
BP1.1 Structural Reliability
(a)
A building or structure, during construction and use, with appropriate degrees of reliability, must—
(i)
perform adequately under all reasonably expected design actions; and…
/news/2022/overview-changes-energy-efficiency-and-condensation
Here are the key changes in residential energy efficiency for NCC 2022.
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c34-fire
1. Scope
This Specification sets out requirements for the construction of fire doors, smoke doors, fire windows and fire shutters.
Intent
To prescribe standards for the construction of fire doors, smoke doors, fire windows and fire shutters…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c34-fire-doors-smoke
1. Scope
This Specification sets out requirements for the construction of fire doors, smoke doors, fire windows and fire shutters.
Intent
To prescribe standards for the construction of fire doors, smoke doors, fire windows and fire shutters…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/news/2022/additional-webinar-session-added-2022-ncc-seminars-volume-three
Due to popular demand we are offering a second webinar session.
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/section-c-fire-resistance
VERIFICATION METHODS
CV1
Compliance with CP2(a)(iii) to avoid the spread of fire between buildings on adjoining allotments is verified when it is calculated that—
(a)
a building will not cause heat flux in excess of those set out in column 2 of…
Scoping study of condensation in residential buildings
/resource/report/scoping-study-condensation-residential-buildings
Provides an overview of condensation in residential buildings, and discussions about why condensation risk, and occurrences of condensation and mould may be increasing within current Australian residential buildings. Please note: ‘Appendix 02 - Survey…
/editions/2016-a1/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3101-high
Performance Requirements
Appropriate Performance Requirements:
Where an alternative method of constructing in high wind areas is proposed as a Performance Solution to that described in Part 3.10.1, that proposal must comply with—
P2.1.1; and
the…
/editions/2016/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3101-high-wind
Performance Requirements
Appropriate Performance Requirements:
Where an alternative method of constructing in high wind areas is proposed as a Performance Solution to that described in Part 3.10.1, that proposal must comply with—
P2.1.1; and
the…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
Requirements GP4.1 to
GP4.4 are satisfied…
/resource/report/accessible-housing-estimated-cost-impact-proposed-changes-ncc
This updated report presents an order of cost estimate for the proposed changes to the National Construction Code of Australia (NCC) to include mandatory minimum accessible housing provisions for new Class 1a (single residential) and Class 2 (…
Schedule of Products - Heated Water Products
/schedule-products-heated-water-products
Schedule of Products - Heated Water Products
/editions/2016-a1/ncc-2016-volume-two/australian-capital-territory/act-712-heating-and-cooling-loads
(a)
Subject to (b) to (e), 3.12.0(a)(i) may apply to—
(i)
a whole dwelling as added to or as extended; or
(ii)
a house-like addition or extension as if 3.12.0.1 expressly indicated it applied to a large part of a building and as if the…
/editions/2016/ncc-2016-volume-two/australian-capital-territory/act-712-heating-and-cooling-loads
(a)
Subject to (b) to (e), 3.12.0(a)(i) may apply to—
(i)
a whole dwelling as added to or as extended; or
(ii)
a house-like addition or extension as if 3.12.0.1 expressly indicated it applied to a large part of a building and as if the…
/news/2017/fire-safety-high-rise-buildings
A lot has been said and debated about the recent Grenfell Tower apartments’ fire in London. It is not intended to repeat or extend that here
/news/2017/comprehensive-package-measures-fire-safety
In late 2016, following substantial analysis of a range of options responding to the Lacrosse fire, the ABCB developed, and the Building Ministers’ Forum agreed, to a comprehensive package of measures.