/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j5-air-conditioning-and
J5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/part-j2-glazing
J2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/part-j2-glazing
J2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/ncc-navigator/lead-free-plumbing-products
The NCC requirements for lead free copper alloys for drinking water will come into force on 1 May 2026. Find out how these changes impact practitioners, suppliers and manufacturers.
/editions/2019-a1/ncc-2019-volume-two-amendment-1/new-south-wales/new-south-wales-variations
Application of New South Wales variations
This Appendix contains variations for application in New South Wales as follows:
NSW Schedule 3 Definitions
Substitute the definition of appropriate authority as follows:
Appropriate…
/editions/2019/ncc-2019-volume-two/new-south-wales/new-south-wales-variations
Application of New South Wales variations
This Appendix contains variations for application in New South Wales as follows:
NSW Schedule 3 Definitions
Substitute the definition of appropriate authority as follows:
Appropriate…
/news/2022/additional-webinar-session-added-2022-ncc-seminars-volumes-one-and-two
Due to popular demand we are offering a second webinar session.
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j5-air
J5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
RequirementJP1 is
satisfied by complying with—
(i…
/resource/calculator/ncc-2022-volume-two-gutters-downpipes-and-overflow-gdo-calculator
Assists in developing a better understanding of the NCC Volume Two ABCB Housing Provision Standard Gutters and Downpipes provisions.
To use the GDO Calculator enter information about the location, roof design and types of overflow measures. Based…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/specification-f29
1. Scope
This Specification contains the requirements for accessible adult change facilities.
Intent
The intent of this Specification is to prescribe how an accessible adult change facility is to be designed and the equipment, fixtures and…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/specification-f29-accessible-adult
1. Scope
This Specification contains the requirements for accessible adult change facilities.
Intent
The intent of this Specification is to prescribe how an accessible adult change facility is to be designed and the equipment, fixtures and…
/events/july-abcb-forum-sydney
The Australian Building Codes Board (ABCB) invites you to attend our ABCB Forum in July.
This forum is an opportunity to talk to our Board Chair, Glenys Beauchamp AO PSM, and CEO, Gary Rake, about any aspect of our…
/education/cpd
We’ve developed a new free educational product range for providers of continuing professional development (CPD).
February CEO update - Gary Rake
/news/2024/february-ceo-update-gary-rake
This is the last week of summer which means many…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e2.2a
1. Scope
This Specification describes the installation and operation of automatic smoke detection and alarm systems.
Intent
To state that Specification E2.2a relates to the installation and operation of automatic alarm systems.
Automatic…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e22a-smoke
1. Scope
This Specification describes the installation and operation of automatic smoke detection and alarm systems.
Intent
To state that Specification E2.2a relates to the installation and operation of automatic alarm systems.
Automatic…
Temporary structures
/resource/standard/temporary-structures
This Standard provides technical design criteria requirements for temporary structures, covering structural safety (particularly determining appropriate wind actions), fire safety (including fire resistance of materials; fire safety services and…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?
Photoluminescence is the…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e48
1. Scope
This Specification contains requirements for photoluminescent exit signs.
Intent
To clarify that provides the design and installation details for photoluminescent exit signs.
What is Photoluminescence?
Photoluminescence is the…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f5-sound-transmission-and
F5.0 Deemed-to-Satisfy Provisions
NT Part F5
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with F5.1 to F5.7.
(b)
Where a Performance Solution is proposed, the relevant…