Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark

NCC 2022 online services are temporarily affected

We are working to fix some display issues with NCC 2022 online. You can still download each volume via the editions page. We apologise for any inconvenience. 

Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

1.1 Purpose
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/11-purpose
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
1.1 Purpose
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/11
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
1.1 Purpose
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/11
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
1.1 Purpose
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/11
1.1 Purpose This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out…
2.8 Design scenario (FI)
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/28-design-scenario-fi
Fire brigade intervention Design scenario in brief This design scenario allows for fire brigade intervention. Required outcome Demonstrate that the fire brigade can undertake fire brigade intervention until completion of search and rescue…
2.8 Design scenario (FI)
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/28-design-scenario-fi
Fire brigade intervention Design scenario in brief This design scenario allows for fire brigade intervention. Required outcome Demonstrate that the fire brigade can undertake fire brigade intervention until completion of search and rescue…
2.8 Design scenario (FI)
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/28-design-scenario
Fire brigade intervention Design scenario in brief Design scenario in brief This design scenario allows for fire brigade intervention. Required outcome Demonstrate that the fire brigade can undertake fire brigade intervention until…
2.8 Design scenario (FI)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/28
Fire brigade intervention Design scenario in brief This design scenario allows for fire brigade intervention. Required outcome Demonstrate that the fire brigade can undertake fire brigade intervention until completion of…
2.8 Design scenario (FI)
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/28
Fire brigade intervention Design scenario in brief This design scenario allows for fire brigade intervention. Required outcome Demonstrate that the fire brigade can undertake fire brigade intervention until completion of search and rescue…
2.8 Design scenario (FI)
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/28
Fire brigade intervention Design scenario in brief Design scenario in brief This design scenario allows for fire brigade intervention. Required outcome Demonstrate that the fire…
Part 2.1 Structure
/editions/2019/ncc-2019-volume-two/section-2-performance-provisions/part-21-structure
Explanatory information: Explanatory information: Objective O2.1 The Objective is to— safeguard people from injury caused by structural failure; and safeguard people from loss of amenity caused by structural behaviour; and protect…
Part 2.1 Structure
/editions/2019-a1/ncc-2019-volume-two-amendment-1/section-2-performance-provisions/part-21-structure
Explanatory information: Explanatory information: Objective O2.1 The Objective is to— safeguard people from injury caused by structural failure; and safeguard people from loss of amenity caused by structural behaviour; and protect…
Part B1 Structural provisions
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-b-structure/part-b1-structural-provisions
Performance Requirements BP1.1 Structural Reliability (a) A building or structure, during construction and use, with appropriate degrees of reliability, must— (i) perform adequately under all reasonably expected design actions; and…
Part B1 Structural provisions
/editions/2019/ncc-2019-volume-one/section-b-structure/part-b1-structural-provisions
Performance Requirements BP1.1 Structural Reliability (a) A building or structure, during construction and use, with appropriate degrees of reliability, must— (i) perform adequately under all reasonably expected design actions; and…
The what and how of fire hazard properties for wall and ceiling linings
/news/2021/what-and-how-fire-hazard-properties-wall-and-ceiling-linings

You may have a report or certificate indicating satisfactory fire hazard properties for a wall or ceiling lining, but still may not be meeting the requirements of the NCC.

Part 2.6 Energy efficiency
/editions/2019/ncc-2019-volume-two/section-2-performance-provisions/part-26-energy-efficiency
Note: Note: From 1 May 2019 to 30 April 2020 Part 2.6 of NCC 2016 Volume Two may apply instead of Part 2.6 of NCC 2019. From 1 May 2020 Part 2.6 of NCC 2019 applies. State and Territory Variations State and Territory Variations In New…
Part 2.6 Energy efficiency
/editions/2019-a1/ncc-2019-volume-two-amendment-1/section-2-performance-provisions/part-26-energy
Note: Note: From 1 May 2019 to 30 April 2020 Part 2.6 of NCC 2016 Volume Two may apply instead of Part 2.6 of NCC 2019. From 1 May 2020 Part 2.6 of NCC 2019 applies. State and Territory…
Part 3.5.2 Gutters And Downpipes
/editions/2016/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements Appropriate : Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with— P2.2.1 ; and the relevant Performance…
Part 3.5.2 Gutters And Downpipes
/editions/2016-a1/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Appropriate Performance Requirements Appropriate : Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with— P2.2.1 ; and the relevant Performance…
Part F2 Sanitary and other facilities
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f2-sanitary-and-other
Performance Requirements FP2.1 Personal hygiene facilities Suitable sanitary facilities for personal hygiene must be provided in a convenient location within or associated with a building, to the degree necessary, appropriate to— (a) the…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Building services (15)
  • Structural safety (14)
  • Energy efficiency (10)
  • Fire safety (9)
  • Plumbing and drainage (8)
  • Water services (8)
  • Performance (7)
  • Health and amenity (6)
  • Product certification (6)
  • Access and egress (4)
  • Governing Requirements (1)
  • NCC compliance (1)

Content type

  • Show all (296)
  • NCC Page (204)
  • Resource (37)
  • Article (28)
  • Page (19)
  • Video (3)
  • NCC Navigator Page (2)
  • Page (CPD) (1)
  • (-) PCD (2)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube