/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/27-design-scenario
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/27-design-scenario
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Rapid fire spread involving internal surface linings
Design scenario in brief
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f6-condensation
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Performance Requirements
FP6.1 Condensation and water vapour management
In a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, risks associated with water vapour and condensation must be managed to minimise their impact on…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h117-premises-lead-processing
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f6-condensation-management
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Performance Requirements
FP6.1 Condensation and water vapour management
In a sole-occupancy unit of a Class 2 building or a Class 4 part of a building, risks associated with water vapour and condensation must be managed to minimise their impact on…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h117-premises-lead-processing
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-d-access-and-egress
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided…
/editions/2019/ncc-2019-volume-one/south-australia/section-d-access-and-egress
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided from the following:
(iii)
a storage shed in a…
/news/2017/fire-safety-high-rise-buildings
A lot has been said and debated about the recent Grenfell Tower apartments’ fire in London. It is not intended to repeat or extend that here
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
/editions/2016/ncc-2016-volume-one/new-south-wales/nsw-part-h103-drive-theatres
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
NSW H103.1 Application of Part
This Part applies to drive-in theatres.
NSW H103.2 Speaker standards
Speaker standards must—
(a)
be placed at a minimum of 5.5 m centres in a line along each parking ramp; and
(b)
be capable of…
/editions/2016-a1/ncc-2016-volume-one/new-south-wales/nsw-part-h103-drive-theatres
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
NSW H103.1 Application of Part
This Part applies to drive-in theatres.
NSW H103.2 Speaker standards
Speaker standards must—
(a)
be placed at a minimum of 5.5 m centres in a line along each parking ramp; and
(b)
be capable of…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/nsw-part-h103-drive-theatres
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
NSW H103.1 Application of Part
This Part applies to drive-in theatres.
NSW H103.2 Speaker standards
Speaker standards must—
(a)
be placed at a minimum of 5.5 m centres in a line along each parking ramp; and
(b)
be capable of…
/editions/2019/ncc-2019-volume-one/new-south-wales/nsw-part-h103-drive-theatres
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
NSW H103.1 Application of Part
This Part applies to drive-in theatres.
NSW H103.2 Speaker standards
Speaker standards must—
(a)
be placed at a minimum of 5.5 m centres in a line along each parking ramp; and
(b)
be capable of…
/news/2022/new-whole-home-energy-efficiency-whats-it-all-about
You may have heard there are new whole-of-home (WOH) energy efficiency requirements for residential buildings in NCC 2022. But what does this actually mean?
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h108-pharmacies
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h108-pharmacies
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Tas H108.1 Application of Part
This Part applies to all pharmacy business premises registered under the Pharmacy Control Act.
Pharmacies must be able to be secured against entry and the interior must be able to be supervised by a pharmacist.…
/editions/2016/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/editions/2016-a1/ncc-2016-volume-two/part-35-roof-and-wall-cladding/part-352-gutters-and-downpipes
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Appropriate Performance Requirements
Appropriate :
Where an alternative gutter and downpipe system is proposed as a Performance Solution to that described in Part 3.5.2, that proposal must comply with—
P2.2.1
; and
the relevant Performance…
/resources/videos/applying-ncc-provision-a224-interactive-case-study
This case study of a residential apartment building is applied using the NCC provision A2.2(4). This four-step process demonstrates a sanitary drainage Performance Solution.
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
/ncc-navigator/thermal-bridging-residential-buildings
This document explains the requirements for reducing thermal bridging in residential buildings focusing on metal-framed walls, roofs, ceilings and floors. It provides practical guidance on compliance options and methods to improve energy efficiency and…
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID: