Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark

NCC 2022 online services are temporarily affected

We are working to fix some display issues with NCC 2022 online. You can still download each volume via the editions page. We apologise for any inconvenience. 

Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Part 3.8.1 Wet Areas And External Waterproofing
/editions/2016-a1/ncc-2016-volume-two/part-38-health-and-amenity/part-381-wet-areas-and-external
Performance Requirements Appropriate Performance Requirements: Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part 3.8.1, that proposal…
Part 3.10.1 High Wind Areas
/editions/2016-a1/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3101-high
Performance Requirements Appropriate Performance Requirements: Where an alternative method of constructing in high wind areas is proposed as a Performance Solution to that described in Part 3.10.1, that proposal must comply with— P2.1.1; and the…
Part 3.10.3 Flood Hazard Areas
/editions/2016-a1/ncc-2016-volume-two/part-310-additional-construction-requirements/part-3103-flood
Appropriate Performance Requirements Appropriate Performance Requirements: Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.3, that proposal must comply with— ; and the relevant Performance…
Part 3.10.3 Flood hazard areas
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-310-ancillary-provisions-and-additional/p3.10.3
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.3, that proposal must comply with— Performance RequirementP2.1.2; and…
Part 3.10.4 Construction in alpine areas
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-310-ancillary-provisions-and-additional/p3.10.4
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative alpine area egress design is proposed as a Performance Solution to that described in Part 3.10.4, that proposal must comply with—…
Part G4 Construction in alpine areas (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied…
Part G5 Construction in bushfire prone areas
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g5
Performance Requirements NSW GP5.1 Qld GP5.1 Bushfire Verification Method GP5.1 Bushfire resistance A building that is constructed in a designated bushfire prone area must, to the degree necessary, be designed and constructed to…
Part 3.8.1 Wet areas and external waterproofing
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-38-health-and-amenity/part-381-wet-areas-and
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part…
Part G4 Construction in alpine areas (DtS)
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with— (i) G4.1 to G4.9; and (ii) for a…
Part G5 Construction in bushfire prone areas
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g5-construction-bushfire
Performance Requirements NSW GP5.1 Qld GP5.1 Bushfire Verification Method GP5.1 Bushfire resistance A building that is constructed in a designated bushfire prone area must, to the degree necessary, be designed and constructed to…
Part 3.8.1 Wet areas and external waterproofing
/editions/2019/ncc-2019-volume-two/part-38-health-and-amenity/part-381-wet-areas-and-external
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part…
Part 3.10.3 Flood hazard areas
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative design is proposed as a Performance Solution to that described in Part 3.10.3, that proposal must comply with— Performance RequirementP2.1.2; and…
Part 3.10.4 Construction in alpine areas
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative alpine area egress design is proposed as a Performance Solution to that described in Part 3.10.4, that proposal must comply with—…
Part F2 Wet areas and overflow protection
/editions/ncc-2022/adopted/volume-one/f-health-and-amenity/part-f2-wet-areas-and-overflow-protection
Introduction to this Part This Part is intended to minimise the risk of water from internal wet areas accumulating…
Part G5 Construction in bushfire prone areas
/editions/ncc-2022/adopted/volume-one/g-ancillary-provisions/part-g5-construction-bushfire-prone-areas
Introduction to this Part This Part contains additional requirements for the construction of buildings located in…
Part 3.8.1 Wet Areas And External Waterproofing
/editions/2016/ncc-2016-volume-two/part-38-health-and-amenity/part-381-wet-areas-and-external
Performance Requirements Appropriate Performance Requirements: Where an alternative system for external waterproofing a roof or external wall of a building is proposed as a Performance Solution to that described in Part 3.8.1, that proposal…
Construction of houses in a flood hazard area performance scenario
/resource/case-study/construction-houses-flood-hazard-area-performance-scenario

Shows the performance-based design process for a house in a flood hazard area. It is recommended to read in conjunction with the Developing a Performance Solution process document.

Standard-construction-buildings-in-flood-hazard-areas.pdf (919.26 KB)
Part 3.10.5 Construction in bushfire prone areas
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-310-ancillary-provisions-and-additional/p3.10.5
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternate bushfire protection design is proposed as a Performance Solution to that described in Part 3.10.5, that proposal must comply with—…
Condensation management: Which ceiling area do I measure?
/resources/videos/condensation-management-which-ceiling-area-do-i-measure

NCC condensation provisions require a calculation to determine if a roof is sufficiently ventilated to receive discharge from an exhaust fan. This video describes how that calculation is performed, and answers some common questions on this topic.

Specification B1.2 Design of buildings in cyclonic areas
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-b-structure/specification-b12-design
1. Scope This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2. For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • …
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Health and amenity (16)
  • Energy efficiency (15)
  • Performance (14)
  • Access and egress (10)
  • Structural safety (10)
  • Building services (9)
  • Fire safety (9)
  • Plumbing and drainage (8)
  • Water services (7)
  • NCC compliance (5)
  • Product certification (4)

Content type

  • Show all (1002)
  • NCC Page (877)
  • Article (66)
  • Page (21)
  • Resource (18)
  • NCC Navigator Page (7)
  • Video (4)
  • Campaign (1)
  • (-) PCD (8)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube